Initial commit of io8 project

This commit is contained in:
user 2025-09-24 10:22:22 +00:00
parent 734e4a743e
commit cfc1c05d3a
28 changed files with 2254 additions and 9 deletions

57
.io8project/.state.json Normal file
View File

@ -0,0 +1,57 @@
{
"current_task_id": "6ea105be-69da-4333-97ff-d3562ea33775",
"completed_tasks": [],
"agent_sequence_index": 0,
"debug_attempts": 0,
"current_agent": "architect",
"progress_percentage": 0.0,
"context": {
"uploaded_files": [],
"project_path": "/tmp/bmad_output/todoapp1_20250924_101300",
"io8_project_path": "/tmp/bmad_output/todoapp1_20250924_101300/.io8project",
"agent_sequence": [
"io8project_builder",
"io8directory_structure",
"io8codermaster",
"io8analyst",
"io8architect",
"io8pm",
"io8sm",
"io8developer",
"io8devops"
],
"agent_models": [
null,
null,
null,
null,
null,
null,
null,
null,
null
],
"agent_temperatures": [
null,
null,
null,
null,
null,
null,
null,
null,
null
],
"agent_clis": [
"gemini",
"surecli",
"surecli",
"surecli",
"surecli",
"surecli",
"gemini",
"gemini",
"gemini"
]
}
}

View File

@ -0,0 +1 @@
{"project": "metadata"}

View File

@ -0,0 +1,46 @@
# Base project detected - ONLY document existing structure
# DO NOT create any directories or files
# DO NOT run mkdir, touch, or any file creation commands
Existing Directory Structure for Project: todoapp1
```
./
├── .io8project/
│ ├── .state.json
│ └── project_metadata.json
├── cloned base project/
│ ├── .sureai/
│ │ ├── uploads/
│ │ ├── .directory_structure_todoapp1_20250924_101300.md
│ │ ├── .bmad_agent_todoapp1_20250924_101300.md
│ │ ├── .analyst_agent_todoapp1_20250924_101300.md
│ │ ├── .architect_agent_todoapp1_20250924_101300.md
│ │ ├── .pm_agent_todoapp1_20250924_101300.md
│ │ ├── .sm_agent_todoapp1_20250924_101300.md
│ │ ├── .developer_agent_todoapp1_20250924_101300.md
│ │ ├── .devops_agent_todoapp1_20250924_101300.md
│ │ ├── .bmad_*.md
│ │ ├── .analyst_*.md
│ │ ├── .architect_*.md
│ │ ├── .developer_*.md
│ │ ├── .devops_*.md
│ │ ├── .pm_*.md
│ │ ├── .sm_*.md
│ │ ├── analysis_document.md
│ │ ├── requirements_document.md
│ │ ├── architecture_document.md
│ │ ├── tech_stack_document.md
│ │ ├── prd_document.md
│ │ ├── project_plan.md
│ │ └── tasks_list.md
│ │ └── sprint_plan.md
├── backend/
├── frontend/
├── deployment_config.yml
├── Dockerfile.backend
├── Dockerfile.frontend
└── docker-compose.yml
```
Base project structure documented - no files created except user specific agent prompts

View File

@ -0,0 +1,111 @@
# io8 Business Analyst Agent - Customized for This Project
## Project-Specific Instructions
## Analysis Document Update - 2025-09-24T10:30:00
This section details the analysis for the `todoapp1` project, building upon the existing base project.
### Project Overview
The `todoapp1` project aims to create a simple to-do list application. This will involve a frontend user interface for adding, managing, and viewing to-do items, and a backend API for data persistence. The project leverages the existing base project structure for efficiency, focusing on extending existing capabilities rather than rebuilding from scratch.
### User Requirements Analysis
Based on the user prompt and the `io8codermaster` breakdown, the key user requirements are:
* **Add new to-do items:** Users should be able to add new to-do items with descriptions.
* **View existing to-do items:** Users should be able to view a list of existing to-do items.
* **Mark to-do items as complete:** Users should be able to mark to-do items as completed.
* **Delete to-do items:** Users should be able to delete to-do items.
* **(Optional) User Authentication:** The need for user authentication will be determined in a later stage.
### Functional Requirements Breakdown
The following functional requirements are derived from the user requirements:
* **FR-001: Add ToDo Item:** The system shall allow users to add a new to-do item with a description.
* **FR-002: View ToDo Items:** The system shall display a list of existing to-do items.
* **FR-003: Mark ToDo Item Complete:** The system shall allow users to mark a to-do item as complete.
* **FR-004: Delete ToDo Item:** The system shall allow users to delete a to-do item.
* **FR-005 (Optional): User Authentication:** The system shall implement user authentication if determined necessary.
### Non-Functional Requirements
The following non-functional requirements are considered:
* **NFR-001: Performance:** The application should load quickly and respond efficiently to user input.
* **NFR-002: Usability:** The user interface should be intuitive and easy to use.
* **NFR-003: Security:** The application should handle data securely, especially if user authentication is implemented.
### User Stories
* **US-001:** As a user, I want to add a new to-do item so that I can track my tasks.
* **Acceptance Criteria:** A new to-do item with a description is added to the list and is persistent across sessions.
* **US-002:** As a user, I want to view all my to-do items so that I can see what tasks I need to complete.
* **Acceptance Criteria:** The list of to-do items is displayed accurately and up-to-date.
* **US-003:** As a user, I want to mark a to-do item as complete so that I can track my progress.
* **Acceptance Criteria:** The status of the selected to-do item changes to 'complete'.
* **US-004:** As a user, I want to delete a to-do item so that I can remove completed or irrelevant tasks.
* **Acceptance Criteria:** The selected to-do item is removed from the list and persistence is updated.
### Business Rules
* To-do items cannot have empty descriptions.
* Completed to-do items can be unmarked.
## Requirements Document Update - 2025-09-24T10:30:00
This section provides further detail on the requirements for the `todoapp1` project.
### FR-001: Add ToDo Item
- **Description:** Allows users to add a new to-do item with a description.
- **Acceptance Criteria:** A new to-do item with a non-empty description is added to the list and persists across sessions. The UI provides clear feedback to the user indicating successful addition.
- **Priority:** High
### FR-002: View ToDo Items
- **Description:** Displays a list of existing to-do items.
- **Acceptance Criteria:** A list of all to-do items, including their descriptions and completion status, is displayed. The list is updated in real-time as items are added, updated, or deleted.
- **Priority:** High
### FR-003: Mark ToDo Item Complete
- **Description:** Allows users to mark a to-do item as complete.
- **Acceptance Criteria:** The status of the selected to-do item is updated to 'complete' in both the UI and the persistent data store. The UI provides clear visual feedback showing the item is complete.
- **Priority:** High
### FR-004: Delete ToDo Item
- **Description:** Allows users to delete a to-do item.
- **Acceptance Criteria:** The selected to-do item is removed from the list and the persistent data store is updated. The UI provides clear visual feedback showing the item is deleted.
- **Priority:** High
### FR-005 (Optional): User Authentication
- **Description:** Implements user authentication (if determined necessary in later stages).
- **Acceptance Criteria:** Users must successfully authenticate before accessing and managing to-do items. Authentication mechanisms will be determined in a later stage by the Architect and Developer agents.
- **Priority:** Medium
### Non-Functional Requirements
### NFR-001: Performance
- **Description:** The application should load quickly and respond efficiently to user input.
- **Acceptance Criteria:** The application should load within 3 seconds and respond to user actions within 1 second. Specific performance metrics will be defined in a later stage.
### NFR-002: Usability
- **Description:** The user interface should be intuitive and easy to use.
- **Acceptance Criteria:** Usability testing will be conducted to ensure the application meets usability standards. Specific metrics will be defined in a later stage.
### NFR-003: Security
- **Description:** The application should handle data securely, especially if user authentication is implemented.
- **Acceptance Criteria:** Security vulnerabilities will be addressed through regular security testing and code reviews. Specific security requirements will be detailed in a later stage.
### Data Requirements
The application will require a data model to store to-do items. This model will include at least the following fields:
* `id` (unique identifier)
* `description` (text)
* `completed` (boolean)
### Interface Requirements
The user interface should be simple and easy to use. It should include clear visual cues to indicate the status of each to-do item. The UI should be responsive and adaptive to various screen sizes.
## Base Agent Prompt Reference
This agent is based on the standard io8analyst agent with project-specific customizations above.
Refer to the base io8analyst agent prompt for general principles and workflow instructions.

View File

@ -0,0 +1,75 @@
# io8 System Architect Agent - Customized for This Project
## Project-Specific Instructions
## Architecture Document Update - 2025-09-24T10:58:00
This section details the system architecture for the `todoapp1` project, building upon the existing base project's architecture.
### System Overview Update
The `todoapp1` application will utilize a three-tier architecture: a frontend UI, a backend API, and a database. The frontend will be responsible for user interaction, the backend will handle business logic and data access, and the database will store persistent data.
### Architecture Pattern Update
Given the relative simplicity of the `todoapp1` application, a microservices architecture is not necessary. A simpler RESTful API architecture will suffice for this project.
### Component Design Update
The frontend will consist of the following main components:
* **TaskListComponent:** Displays the list of to-do items, allowing users to filter, sort, and view task details.
* **TaskItemComponent:** Represents a single to-do item, allowing users to mark it as complete, edit it, or delete it.
* **AddTaskComponent:** A form allowing users to create new to-do items.
* **EditTaskComponent:** A form for modifying existing to-do items.
The backend API will include endpoints for:
* `/tasks`: GET (retrieve all tasks), POST (add a new task), PUT (update a task), DELETE (delete a task).
### Data Architecture Update
The application will utilize a relational database (PostgreSQL, chosen for its scalability and ease of use). The database schema will include a table named `tasks` with the following columns:
* `id` (SERIAL PRIMARY KEY)
* `description` (TEXT NOT NULL)
* `dueDate` (TIMESTAMP WITH TIME ZONE)
* `completed` (BOOLEAN)
### API Design Update
The API will utilize standard RESTful principles. All endpoints will return JSON data. Error handling will be implemented to provide informative error messages to the client.
### Security Architecture Update
For the MVP, no user authentication will be implemented. This aspect may be revisited in later iterations. However, appropriate input sanitization and validation will be employed on the frontend to prevent common vulnerabilities like XSS.
### Scalability Considerations Update
The chosen architecture is scalable enough to handle a reasonable number of concurrent users. The use of PostgreSQL and efficient database queries should ensure the application remains performant even with a growing number of tasks. Load balancing could be explored in future iterations if significant scaling becomes necessary.
## Technology Stack Update - 2025-09-24T10:58:00
This section details the technology stack choices for the `todoapp1` project.
### Frontend Technologies Update
* **Framework:** Angular
* **Styling:** Angular Material (chosen for its material design and easy integration with Angular)
* **State Management:** Angular's built-in state management capabilities will be sufficient for the MVP.
### Backend Technologies Update
* **Language:** Node.js with TypeScript (for better type safety and maintainability)
* **Framework:** Express.js (a minimal and flexible Node.js framework)
* **API:** RESTful API
* **ORM:** TypeORM (an ORM that supports PostgreSQL and simplifies database interactions)
### Database Technologies Update
* **Primary Database:** PostgreSQL
### Infrastructure Update
* **Deployment:** Docker for containerization
* **Hosting:** AWS (specifically, an Elastic Beanstalk instance for simple deployment and scaling)
### Development Tools Update
* **Version Control:** Git
* **Testing:** Jest, Cypress (for unit and integration testing)
* **CI/CD:** GitHub Actions
## Base Agent Prompt Reference
This agent is based on the standard io8architect agent with project-specific customizations above.
Refer to the base io8architect agent prompt for general principles and workflow instructions.

View File

@ -0,0 +1,75 @@
# io8 Code Master Agent - Customized for This Project
## Project-Specific Instructions
## io8coder Master Agent Breakdown - todoapp1 - 2025-09-24
This breakdown details the project scope for `todoapp1`, a simple to-do application built upon a cloned base project. The focus is on efficiently adapting the existing structure rather than building from scratch.
**Project Goals:**
- Develop a functional to-do application.
- Leverage the existing base project's structure and components.
- Implement a clean and maintainable codebase.
**Milestones:**
- **Requirement Gathering & Analysis (Complete):** Initial requirements captured from the user prompt and base project.
- **Architecture Design (io8architect):** Define the application architecture, taking into account the existing base project structure.
- **Technology Selection (io8architect):** Determine appropriate technologies for the frontend and backend, aligning with the base project where possible.
- **Development (io8developer):** Implement the frontend and backend components.
- **Testing (io8developer):** Thoroughly test the application.
- **Deployment (io8devops):** Deploy the application to the chosen environment.
**Constraints:**
- Adherence to the base project's existing directory structure and configuration files.
- Efficient use of existing components and modules.
- Time constraints based on the complexity of `todoapp1`.
**Assumptions:**
- The base project provides a solid foundation.
- The base project contains pre-built components that can be leveraged.
- Development time is well-constrained.
**Next Steps:** io8analyst will refine requirements based on the base project, io8architect will detail the architecture and tech stack.
## io8coder Master Agent Plan - todoapp1 - 2025-09-24
This plan outlines the implementation strategy for the `todoapp1` project. The plan leverages the existing base project, focusing on incremental development and efficient resource allocation.
**Timeline:**
- **Phase 1 (Day 1):** Requirement analysis, architecture design, technology selection (io8analyst, io8architect).
- **Phase 2 (Days 2-3):** Frontend and backend development (io8developer).
- **Phase 3 (Day 4):** Testing and bug fixing (io8developer).
- **Phase 4 (Day 5):** Deployment and final review (io8devops).
**Resources:**
- Existing base project
- io8analyst agent
- io8architect agent
- io8developer agent
- io8devops agent
**Tasks:**
- [ ] Analyze requirements (io8analyst)
- [ ] Design application architecture (io8architect)
- [ ] Select technologies (io8architect)
- [ ] Develop frontend (io8developer)
- [ ] Develop backend (io8developer)
- [ ] Test application (io8developer)
- [ ] Deploy application (io8devops)
- [ ] Final review and documentation
**Risk Mitigation:**
- Regular communication between agents.
- Continuous integration and continuous deployment (CI/CD) pipeline.
- Backups of the base project and agent outputs.
**Communication:**
- Utilize agent-specific prompt files for clear communication.
- Maintain a central repository for all documents and artifacts.
**Next Steps:** io8pm will create a more detailed sprint plan, and individual agent prompts will be refined.
## Base Agent Prompt Reference
This agent is based on the standard io8codermaster agent with project-specific customizations above.
Refer to the base io8codermaster agent prompt for general principles and workflow instructions.

View File

@ -0,0 +1,150 @@
# io8 Project Manager Agent - Customized for This Project
## Project-Specific Instructions
# Product Requirements Document (PRD) Update - 2025-09-24T11:15:00
## 1. Executive Summary Update - 2025-09-24T11:15:00
This update to the PRD focuses on the `todoapp1` project, a simple to-do list application. The application will allow users to add, edit, mark as complete, and delete to-do items. The application will utilize an Angular frontend and a Node.js/Express.js backend with PostgreSQL database.
## 3. Target Users & Personas Update - 2025-09-24T11:15:00
The target users for `todoapp1` are individuals seeking a simple and effective way to manage their to-do lists. Personas may include students, professionals, or anyone who needs to organize tasks.
## 4. Problem Statement Update - 2025-09-24T11:15:00
Many individuals struggle to effectively manage their to-do lists, leading to missed deadlines and decreased productivity. This application aims to solve this problem by providing a user-friendly interface for creating, organizing, and tracking tasks.
## 5. Solution Overview Update - 2025-09-24T11:15:00
`todoapp1` will provide a web-based to-do list application with the following key features:
* Adding new tasks with descriptions and optional due dates.
* Marking tasks as complete.
* Editing existing tasks.
* Deleting tasks.
* Viewing tasks, filtered by completion status and sorted by due date.
## 6. Functional Requirements Update - 2025-09-24T11:15:00
This section expands on the functional requirements outlined in the previous analysis:
* **FR-006: Add Task:** The system shall allow users to add a new task with a description and an optional due date.
* **FR-007: Mark Task Complete:** The system shall allow users to mark a task as complete.
* **FR-008: Edit Task:** The system shall allow users to edit the description and due date of an existing task.
* **FR-009: Delete Task:** The system shall allow users to delete a task from the list.
* **FR-010: View Tasks:** The system shall display a list of all tasks, including their description, due date, and completion status.
* **FR-011: Filter Tasks:** The system shall allow users to filter the tasks by completion status (completed/incomplete).
* **FR-012: Sort Tasks:** The system shall allow users to sort the tasks by due date (ascending/descending).
## 7. Non-Functional Requirements Update - 2025-09-24T11:15:00
* **NFR-004: Performance:** The application should respond to user actions within 2 seconds.
* **NFR-005: Usability:** The application should have a simple and intuitive interface, easy for users of all technical abilities to use.
* **NFR-006: Security:** Basic input validation and sanitization should prevent common web vulnerabilities. For MVP, no user authentication is required.
* **NFR-007: Scalability:** The application should be scalable to handle a large number of users and tasks in the future. This is addressed by using PostgreSQL and a suitable cloud infrastructure.
## 8. Epic Stories Update - 2025-09-24T11:15:00
### Epic 1: Task Management
**Epic Description:** This epic encompasses all features related to managing to-do tasks, including adding, editing, deleting, and viewing tasks.
**Business Value:** Provides core functionality for users to manage their to-do lists.
**Acceptance Criteria:** All user stories within this epic are completed and successfully tested.
**User Stories:**
- **US-001:** As a user, I want to add a new task to my to-do list so that I can keep track of my tasks.
- **Acceptance Criteria:** New tasks are added to the list, including a description and an optional due date.
- **Story Points:** 3
- **Priority:** High
- **US-002:** As a user, I want to be able to mark a task as complete so that I can track my progress.
- **Acceptance Criteria:** Task status updates correctly in UI and database.
- **Story Points:** 2
- **Priority:** High
- **US-003:** As a user, I want to edit existing tasks so that I can update task details if needed.
- **Acceptance Criteria:** Description and due date are updated correctly.
- **Story Points:** 3
- **Priority:** High
- **US-004:** As a user, I want to be able to delete tasks so that I can remove completed or irrelevant tasks.
- **Acceptance Criteria:** Task is removed from list and database.
- **Story Points:** 2
- **Priority:** High
- **US-005:** As a user, I want to view my to-do list, filtered by completion status.
- **Acceptance Criteria:** Filtering functionality allows user to view only complete or incomplete tasks.
- **Story Points:** 5
- **Priority:** Medium
- **US-006:** As a user, I want to be able to sort my to-do list by due date.
- **Acceptance Criteria:** Sorting functionality works correctly (ascending/descending).
- **Story Points:** 5
- **Priority:** Medium
## 10. Technical Requirements Update - 2025-09-24T11:15:00
* Frontend: Angular, Clarity Design System
* Backend: Node.js, Express.js, TypeScript
* Database: PostgreSQL
* API: RESTful API
* Deployment: Docker, AWS Elastic Beanstalk
## 11. Success Metrics & KPIs Update - 2025-09-24T11:15:00
* Number of users
* Number of tasks created
* User engagement (time spent on the application)
* Task completion rate
## 12. Risk Assessment Update - 2025-09-24T11:15:00
* Risk: Database migration issues. Mitigation: Thorough testing of database interactions.
* Risk: Unexpected performance bottlenecks. Mitigation: Performance monitoring and optimization.
## 13. Timeline & Milestones Update - 2025-09-24T11:15:00
* Week 1: Frontend development, basic task management features
* Week 2: Backend API development, database integration
* Week 3: Filtering and sorting functionality, testing
* Week 4: Deployment to AWS Elastic Beanstalk
# Project Plan Update - 2025-09-24T11:20:00
## Project Overview
This document outlines the project plan for the `todoapp1` application, a simple to-do list application. The project will leverage the Angular Clarity Boilerplate for the frontend and will utilize Node.js with Express.js for the backend. Data persistence will be handled by a PostgreSQL database. The project will follow an Agile methodology.
## Project Goals
* Develop a functional to-do list application.
* Implement features for adding, editing, deleting, and viewing tasks.
* Integrate filtering and sorting capabilities.
* Deploy the application to a cloud-based environment.
## Methodology
Agile (Scrum) methodology will be used. Sprints will be two weeks long.
## Timeline
**Phase 1: Sprint 1 (Weeks 1-2):** Focus on core functionality (add, edit, delete, view tasks) and backend development.
* Deliverable: Fully functional core features.
* Task Breakdown: Frontend UI development, backend API development, database schema creation, and basic unit tests.
**Phase 2: Sprint 2 (Weeks 3-4):** Add filtering and sorting, complete testing, and deploy.
* Deliverable: Completed application deployed to AWS Elastic Beanstalk.
* Task Breakdown: Implement filtering and sorting, comprehensive testing (unit, integration, end-to-end), deployment to AWS, and final documentation.
## Tasks & Responsibilities
The team will be responsible for the following tasks:
* **Frontend Development:** Develop the user interface using Angular and Clarity.
* **Backend Development:** Develop the API using Node.js and Express.js.
* **Database Management:** Create and maintain the PostgreSQL database.
* **Testing:** Write unit, integration, and end-to-end tests.
* **Deployment:** Deploy the application to AWS Elastic Beanstalk.
## Risk Management
* **Risk:** Database migration issues. **Mitigation:** Thorough testing of database interactions and a rollback plan.
* **Risk:** Unexpected performance bottlenecks. **Mitigation:** Performance testing and optimization strategies.
* **Risk:** Delays in development. **Mitigation:** Regular sprint reviews and adaptation of the project plan based on progress.
## Communication Plan
Regular daily stand-up meetings will be held to track progress and identify potential roadblocks. Weekly sprint reviews will be conducted to demonstrate completed work and plan for the next sprint. A project management tool (e.g., Jira, Asana) will be used to manage tasks and track progress.
## Success Criteria
The project will be considered successful if the following criteria are met:
* The application is fully functional and meets the defined requirements.
* The application is deployed successfully to AWS Elastic Beanstalk.
* The application is thoroughly tested and free of major bugs.
* The application is well-documented.
## Base Agent Prompt Reference
This agent is based on the standard io8pm agent with project-specific customizations above.
Refer to the base io8pm agent prompt for general PM principles and workflow instructions.

View File

@ -0,0 +1,70 @@
# io8 Project Builder Plan for todoapp1_20250924_101300
This document outlines the base project builder plan for the `todoapp1_20250924_101300` project, covering high-level scaffolding, directory structure, build tools, and pre-developer checks.
## High-Level Scaffolding Plan
### Backend (Spring Boot)
- **Core Application Structure:** Establish the main application class, REST controllers, service layer for business logic, repository layer for data access, and model classes (JPA entities) for Todo items.
- **RESTful API:** Implement standard CRUD (Create, Read, Update, Delete) operations for Todo items via REST endpoints.
- **Database Integration:** Configure and integrate with MySQL database for persistent storage of Todo items.
- **Error Handling & Validation:** Implement basic error handling mechanisms and data validation for API requests.
### Frontend (Angular Clarity)
- **Application Structure:** Set up the main Angular application component, routing configuration, and module structure.
- **UI Components:** Develop dedicated components for:
- Displaying a list of Todo items.
- A form for adding new Todo items.
- A form or view for editing existing Todo items.
- **API Services:** Create Angular services to interact with the backend RESTful API for data retrieval and manipulation.
- **Styling:** Utilize the Clarity Design System for consistent and visually appealing UI elements.
## Directory and File Scaffolding Strategy
The project will adhere to conventional Spring Boot and Angular project structures to ensure maintainability and developer familiarity.
### Backend Directory Structure
- `/src/main/java/com/example/todoapp/`
- `/controller/`: Contains REST controllers (e.g., `TodoController.java`).
- `/service/`: Contains business logic interfaces and implementations (e.g., `TodoService.java`, `TodoServiceImpl.java`).
- `/repository/`: Contains data access interfaces (e.g., `TodoRepository.java`).
- `/model/`: Contains JPA entity classes (e.g., `Todo.java`).
- `TodoappApplication.java`: The main Spring Boot application entry point.
- `/src/main/resources/`:
- `application.properties` or `application.yml`: Configuration files for database connection, server port, etc.
### Frontend Directory Structure
- `/src/app/`
- `/components/`: Contains UI components (e.g., `todo-list/`, `todo-item-detail/`, `todo-form/`).
- `/services/`: Contains Angular services for API interaction (e.g., `todo.service.ts`).
- `/models/`: Contains TypeScript interfaces for data structures (e.g., `todo.ts`).
- `app-routing.module.ts`: Defines application routes.
- `app.component.ts`, `app.component.html`, `app.component.css`: The root Angular component.
- `/src/environments/`: Contains environment-specific configuration files (e.g., `environment.ts`, `environment.prod.ts`).
- `angular.json`: Angular CLI configuration file.
- `package.json`: Node.js package manager configuration for dependencies and scripts.
## Build Tools and Scripts
### Backend
- **Maven/Gradle:** Used for dependency management, project building, and packaging the Spring Boot application into an executable JAR.
- **IDE Features:** Leverage IDEs like IntelliJ IDEA or VS Code with Spring Boot extensions for initial project setup, code generation (e.g., creating new classes, interfaces), and running/debugging the application.
### Frontend
- **Angular CLI:** Essential for generating Angular components, services, modules, and managing the overall Angular project lifecycle (`ng new`, `ng generate`, `ng serve`, `ng build`).
- **npm/Yarn:** Used for managing frontend dependencies and running scripts defined in `package.json`.
## Pre-Developer Checks
Before significant development begins, the following documentation and configurations should be in place to ensure a smooth development process:
- **`README.md`:** A comprehensive README file at the project root, providing:
- Project overview and purpose.
- Setup instructions for both backend and frontend.
- How to run the application locally.
- Basic API documentation (endpoints, request/response formats).
- Contribution guidelines.
- **API Documentation:** Detailed documentation for all backend REST API endpoints, potentially using tools like Swagger/OpenAPI for interactive documentation.
- **Database Schema Definition:** A clear definition of the database schema, including table structures, relationships, and constraints. This could be in the form of SQL scripts or an ORM-generated schema.
- **Environment Setup Guide:** A document detailing the necessary tools, software versions, and environment variables required for local development.
- **Testing Strategy:** A document outlining the project's approach to testing, including unit tests, integration tests, and end-to-end tests for both backend and frontend.

View File

@ -0,0 +1,5 @@
{
"status": "success",
"message": "Build request submitted successfully",
"response_text": "Insert In job Pro Successfully done"
}

View File

@ -0,0 +1,104 @@
{
"projectResp": {
"createdAt": "2025-09-24 10:17:30",
"updatedAt": "2025-09-24 10:17:32",
"createdBy": 10007301,
"updatedBy": 10007301,
"accountId": 122,
"id": 48227,
"owner": "Super Admin",
"owned_by": 10007301,
"projectName": "todoapp1_20250924_101300",
"description": null,
"copyTo": null,
"technologyStack": null,
"projectPrefix": null,
"major_version": null,
"minor_version": null,
"upload_Logo_name": null,
"upload_Logo_path": null,
"namespace": null,
"tags": null,
"category": null,
"accessibility": false,
"is_archived": false,
"is_active": true,
"is_aged": null,
"is_fav": null,
"favCnt": null,
"is_stared": null,
"staredCnt": null,
"is_watchlisted": null,
"watchlistedCnt": null,
"is_futuristic": null,
"futuristicCnt": null,
"is_pinned": null,
"pinnedCnt": null,
"private_deployid": null,
"isprivatedeploy": false,
"registery_profileid": 3,
"isregisteryprofile": true,
"github_profileid": null,
"isgithubprofile": false,
"modules": null,
"favourite": null,
"archived": null,
"workflow_id": 53,
"gitea_url": "http://157.66.191.31:3000/risadmin_prod/todoapp1_20250924_101300.git",
"isfirstbuild": false,
"company_Display_Name": null
},
"backendResp": {
"id": 2491,
"backend_service_name": "todoapp1_20250924_101300-b",
"techstack": "springboot",
"description": null,
"proj_id": 48227,
"isprimary": true,
"db_id": 2677
},
"moduleResp": {
"createdAt": "2025-09-24 10:17:32",
"updatedAt": "2025-09-24 10:17:32",
"createdBy": null,
"updatedBy": null,
"accountId": null,
"id": 48236,
"moduleName": "todoapp1_20250924_101300-f",
"description": null,
"modulePrefix": null,
"copyTo": null,
"technologyStack": "Angular Clarity",
"is_active": true,
"tags": null,
"readme": false,
"dbName": null,
"dbUserName": null,
"dbPassword": null,
"portNumber": null,
"microservice": false,
"portaldeployment": false,
"parentrepo": null,
"copy_baseproj": false,
"loginservice": false,
"testing": false,
"type": null,
"rn_fb_headers": null,
"rn_report_builder": null,
"projectId": 0,
"projectName": null
},
"dbResp": {
"id": 2677,
"db_name": "todoapp1_20250924_101300-d",
"db_type": null,
"db_username": "root",
"db_password": "root",
"port_no": 3306,
"proj_id": 48227,
"techstack": "MySQL",
"host_name": null,
"existing_db": false,
"isdefault": false
}
}

View File

@ -0,0 +1,46 @@
{
"createdAt": "2025-09-24 10:19:26",
"updatedAt": "2025-09-24 10:19:26",
"createdBy": 10007301,
"updatedBy": 10007301,
"accountId": null,
"id": 7696,
"techStack": "springboot",
"objectType": "form",
"subObjectType": "only header",
"uiName": "TodoItem",
"formType": null,
"tableName": null,
"lineTableName": null,
"multilineTableName": null,
"formCode": "TodoItem_view",
"jspName": null,
"controllerName": "TodoItemController",
"serviceName": null,
"serviceImplName": null,
"daoName": null,
"daoImplName": null,
"build": false,
"updated": false,
"menuName": null,
"headerName": "TodoItem",
"convertedTableName": null,
"package_name": null,
"backend_id": 2491,
"testing": false,
"child_form": false,
"add_tomobile": false,
"editable": true,
"is_active": true,
"is_notification": null,
"add_to_card": false,
"card_id": null,
"add_to_apiregistery": null,
"isrealm": false,
"realm_id": null,
"notification_msg": null,
"table_type": null,
"type": null,
"rn_cff_actionBuilder": null,
"serviceTechid": null
}

View File

@ -0,0 +1 @@
git pull successful

1
Dockerfile.backend Normal file
View File

@ -0,0 +1 @@
# Placeholder - DevOps will fill this later

1
Dockerfile.frontend Normal file
View File

@ -0,0 +1 @@
# Placeholder - DevOps will fill this later

0
backend/.gitkeep Normal file
View File

1
deployment_config.yml Normal file
View File

@ -0,0 +1 @@
# Placeholder - DevOps will fill this later

1
docker-compose.yml Normal file
View File

@ -0,0 +1 @@
# Placeholder - DevOps will fill this later

0
frontend/.gitkeep Normal file
View File

1
nginx.conf Normal file
View File

@ -0,0 +1 @@
# Placeholder - DevOps will fill this later

View File

@ -57,4 +57,161 @@ This document outlines the directory structure for the Angular Clarity boilerpla
- `angular.json`: The configuration file for the Angular CLI. - `angular.json`: The configuration file for the Angular CLI.
- `package.json`: Defines the project's dependencies and scripts. - `package.json`: Defines the project's dependencies and scripts.
- `README.txt`: The main documentation file for the project. - `README.txt`: The main documentation file for the project.
- `tsconfig.json`: The configuration file for the TypeScript compiler. - `tsconfig.json`: The configuration file for the TypeScript compiler.
---
## DIRECTORY STRUCTURE UPDATE - 2025-09-24 10:19:52
# Directory Structure for todoapp1 (Base Project)
This document details the directory structure for the `todoapp1` project, building upon an existing cloned base project. No new directories or files are created; this document only reflects the existing structure and any necessary additions based on the user prompt.
**Existing Structure (Cloned Base Project):**
The base project is assumed to contain the standard structure as defined in the agent's core instructions, including the `.sureai/` directory with its predefined documents and the `backend/` and `frontend/` directories (which may already contain code).
**Additions based on `todoapp1` prompt:**
Given the simple nature of a todo application, no significant alterations to the base project's structure are anticipated. The existing `backend/` and `frontend/` directories will be sufficient. The `backend/` directory might contain the API logic, database interaction code, etc., while the `frontend/` directory will likely contain the UI code (React, Vue, etc.). Specific file organization within these directories will be determined by the developer agent based on the chosen technology stack and architecture.
**Configuration File Strategy:**
The root level will contain the standard configuration files like `Dockerfile.backend`, `Dockerfile.frontend`, `docker-compose.yml`, and `deployment_config.yml` as defined in the base project structure. These files will be managed by the DevOps agent.
**Workflow Considerations:**
Since this is a base project, the workflow focuses on documenting the existing structure and any modifications needed based on the `todoapp1` prompt. The developer agent will populate the `backend/` and `frontend/` directories with code, and the DevOps agent will finalize the configuration files. No file creation or modification is performed by this agent.
**Summary:**
The `todoapp1` project leverages the existing cloned base project structure. The directory structure is already complete, and this document serves as a record of its contents and the plan for subsequent agent interactions. No changes to the structure are needed beyond those files that will be created by subsequent agents, specifically in the `.sureai/` directory. The `backend/` and `frontend/` folders will be populated by the developer agent and the root-level configuration files will be handled by the DevOps agent.
---
## DIRECTORY STRUCTURE UPDATE - 2025-09-24 10:20:00
# Base project detected - ONLY document existing structure
# DO NOT create any directories or files
# DO NOT run mkdir, touch, or any file creation commands
Existing Directory Structure for Project: todoapp1
```
./
├── .io8project/
│ ├── .state.json
│ └── project_metadata.json
├── cloned base project/
│ ├── .sureai/
│ │ ├── uploads/
│ │ ├── .directory_structure_todoapp1_20250924_101300.md
│ │ ├── .bmad_agent_todoapp1_20250924_101300.md
│ │ ├── .analyst_agent_todoapp1_20250924_101300.md
│ │ ├── .architect_agent_todoapp1_20250924_101300.md
│ │ ├── .pm_agent_todoapp1_20250924_101300.md
│ │ ├── .sm_agent_todoapp1_20250924_101300.md
│ │ ├── .developer_agent_todoapp1_20250924_101300.md
│ │ ├── .devops_agent_todoapp1_20250924_101300.md
│ │ ├── .bmad_*.md
│ │ ├── .analyst_*.md
│ │ ├── .architect_*.md
│ │ ├── .developer_*.md
│ │ ├── .devops_*.md
│ │ ├── .pm_*.md
│ │ ├── .sm_*.md
│ │ ├── analysis_document.md
│ │ ├── requirements_document.md
│ │ ├── architecture_document.md
│ │ ├── tech_stack_document.md
│ │ ├── prd_document.md
│ │ ├── project_plan.md
│ │ └── tasks_list.md
│ │ └── sprint_plan.md
├── backend/
├── frontend/
├── deployment_config.yml
├── Dockerfile.backend
├── Dockerfile.frontend
└── docker-compose.yml
```
Base project structure documented - no files created except user specific agent prompts
---
## DIRECTORY STRUCTURE UPDATE - 2025-09-24 10:20:07
Base project detected - ONLY documenting existing structure. No files or directories created.
Based on the user prompt 'todoapp1', the existing cloned base project structure will be used as a template. No modifications to the base structure are necessary at this stage. Subsequent agents (e.g., developer, DevOps) will populate the `backend/` and `frontend/` directories with code and configuration files, respectively. The existing `.sureai/` directory will house agent outputs and documents. The root level will contain project-wide configuration files (Dockerfile, docker-compose.yml, etc.). The following files are expected to be present in the `.sureai/` directory post-agent execution:
- `analysis_document.md`
- `requirements_document.md`
- `architecture_document.md`
- `tech_stack_document.md`
- `prd_document.md`
- `project_plan.md`
- `tasks_list.md`
- `sprint_plan.md`
- `.directory_structure_todoapp1_20250924_101300.md` (this document)
- other agent-specific output files (e.g., `.bmad_*.md`, `.analyst_*.md`, etc.)
The `uploads/` subdirectory within `.sureai/` will store any uploaded documents or images.
The `io8project/` directory at the root level will contain project metadata.
No changes or additions to the existing directory structure are needed at this time. The structure is sufficient for the 'todoapp1' project, leveraging the existing base project as a foundation.
---
## DIRECTORY STRUCTURE UPDATE - 2025-09-24 10:20:15
# Base project detected - ONLY documenting existing structure. No files or directories created.
The following structure is based on a cloned base project. This documentation only reflects the existing directory structure and does not include file creation commands.
```
./
├── .io8project/
│ ├── .state.json
│ └── project_metadata.json
├── cloned base project/
│ ├── .sureai/
│ │ ├── uploads/
│ │ ├── analysis_document.md
│ │ ├── requirements_document.md
│ │ ├── architecture_document.md
│ │ ├── tech_stack_document.md
│ │ ├── prd_document.md
│ │ ├── project_plan.md
│ │ ├── tasks_list.md
│ │ └── sprint_plan.md
│ │ ├── .directory_structure_todoapp1_todoapp1_20250924_101300.md
│ │ ├── .bmad_agent_todoapp1_20250924_101300.md
│ │ ├── .analyst_agent_todoapp1_20250924_101300.md
│ │ ├── .architect_agent_todoapp1_20250924_101300.md
│ │ ├── .pm_agent_todoapp1_20250924_101300.md
│ │ ├── .sm_agent_todoapp1_20250924_101300.md
│ │ ├── .developer_agent_todoapp1_20250924_101300.md
│ │ └── .devops_agent_todoapp1_20250924_101300.md
│ │ ├── .bmad_*.md
│ │ ├── .analyst_*.md
│ │ ├── .architect_*.md
│ │ ├── .developer_*.md
│ │ ├── .devops_*.md
│ │ ├── .pm_*.md
│ │ └── .sm_*.md
│ ├── backend/
│ ├── frontend/
│ ├── deployment_config.yml
│ ├── Dockerfile.backend
│ ├── Dockerfile.frontend
│ └── docker-compose.yml
```
**Note:** This reflects the *existing* structure of the cloned base project. No new files or directories were created. Agent outputs will be added to the `.sureai/` directory as the workflow progresses. The user prompt 'todoapp1' has been incorporated into the filenames of the agent output files within the .sureai directory.

View File

@ -65,4 +65,130 @@
* **Phase 4: Build & Deployment** * **Phase 4: Build & Deployment**
* Build the application for production. * Build the application for production.
* Deploy to a hosting service. * Deploy to a hosting service.
* Set up CI/CD pipelines for automated builds and deployments. * Set up CI/CD pipelines for automated builds and deployments.
---
## CODER BREAKDOWN UPDATE - 2025-09-24 10:20:24
## io8coder Master Agent Breakdown - todoapp1 - 2025-09-24 10:20:07
This breakdown details the project scope and constraints for the `todoapp1` application, building upon the cloned base project. The project is a simple todo application, and therefore, the scope is relatively limited.
**Project Scope:**
- Development of a functional todo application.
- Backend API for data persistence (technology to be determined by Architect agent).
- Frontend UI for user interaction (technology to be determined by Architect agent).
- Basic user authentication (optional, to be determined by Analyst agent).
**Constraints:**
- The project leverages a pre-existing base project structure.
- Only append-only updates to the base project structure are permitted.
- The application must be reasonably performant and robust.
- The project should adhere to best practices for clean code and architecture.
**Milestones:**
- **Requirements Gathering (Analyst):** Complete and document user stories and acceptance criteria.
- **Architecture Design (Architect):** Design the application architecture, including technology stack and data models.
- **Backend Development (Developer):** Implement the backend API and data persistence layer.
- **Frontend Development (Developer):** Develop the user interface and integrate with the backend API.
- **Testing & QA (Developer):** Ensure the application is thoroughly tested and meets the defined requirements.
- **Deployment (DevOps):** Deploy the application to a chosen environment.
**Deliverables:**
- Functional todo application (backend and frontend).
- Comprehensive documentation of design and implementation.
- Automated testing suite.
- Deployment scripts and configurations.
**Dependencies:**
-Successful execution of previous agents: `io8project_builder` and `io8directory_structure`
-Successful completion of subsequent agent tasks: `io8analyst`, `io8architect`, `io8developer`, and `io8devops`
---
## CODER BREAKDOWN UPDATE - 2025-09-24 10:20:30
## io8coder Master Agent Breakdown - todoapp1 - 2025-09-24
This breakdown details the project scope for `todoapp1`, a simple to-do application built upon a cloned base project. The focus is on efficiently adapting the existing structure rather than building from scratch.
**Project Goals:**
- Develop a functional to-do application.
- Leverage the existing base project's structure and components.
- Implement a clean and maintainable codebase.
**Milestones:**
- **Requirement Gathering & Analysis (Complete):** Initial requirements captured from the user prompt and base project.
- **Architecture Design (io8architect):** Define the application architecture, taking into account the existing base project structure.
- **Technology Selection (io8architect):** Determine appropriate technologies for the frontend and backend, aligning with the base project where possible.
- **Development (io8developer):** Implement the frontend and backend components.
- **Testing (io8developer):** Thoroughly test the application.
- **Deployment (io8devops):** Deploy the application to the chosen environment.
**Constraints:**
- Adherence to the base project's existing directory structure and configuration files.
- Efficient use of existing components and modules.
- Time constraints based on the complexity of `todoapp1`.
**Assumptions:**
- The base project provides a solid foundation.
- The base project contains pre-built components that can be leveraged.
- Development time is well-constrained.
**Next Steps:** io8analyst will refine requirements based on the base project, io8architect will detail the architecture and tech stack.
---
## CODER BREAKDOWN UPDATE - 2025-09-24 10:20:37
## io8coder Master Agent Breakdown Update - todoapp1 - 2025-09-24 10:20:15
This update incorporates specific details based on the `todoapp1` user prompt.
**Technology Stack (Architect Agent):** The Architect agent will select the technology stack for both the frontend and backend. Possible options include:
* **Frontend:** React, Angular, Vue.js, or a simpler framework.
* **Backend:** Node.js, Python (Flask/Django), or similar. This decision will depend on the requirements outlined by the Analyst agent and the overall architecture.
**Database Selection (Architect Agent):** The Architect agent will also choose the database technology. Options include SQLite, PostgreSQL, MongoDB, etc., based on scalability and project requirements.
**User Authentication (Analyst Agent):** The Analyst agent will determine whether basic user authentication is necessary. This decision will impact the complexity of the backend and the overall project scope.
**Detailed User Stories (Analyst Agent):** The Analyst agent will generate detailed user stories, describing various user interactions, such as adding tasks, marking tasks as complete, deleting tasks, etc. Each user story should have acceptance criteria ensuring proper functionality.
**API Endpoints (Architect Agent):** The Architect agent will define the necessary API endpoints for the backend based on the user stories. These will include endpoints for creating, retrieving, updating, and deleting todo items.
---
## CODER BREAKDOWN UPDATE - 2025-09-24 10:20:46
## io8coder Master Agent Breakdown Update - todoapp1 - 2025-09-24T10:30:00
This update reflects refinements to the project scope based on further analysis of the base project and the `todoapp1` user prompt.
**Revised Milestones:**
- **Requirement Gathering & Analysis (Complete):** Detailed requirements gathered and documented in `.sureai/requirements_document.md`. The application scope is limited to basic CRUD (Create, Read, Update, Delete) functionality for to-do items.
- **Architecture Design (io8architect - Pending):** The architecture will be designed to leverage the existing base project's structure, focusing on minimizing changes to the backend and potentially using a pre-existing frontend framework.
- **Technology Selection (io8architect - Pending):** Technology selection will align with existing backend technologies in the base project and use a simple, commonly used frontend framework.
- **Development (io8developer - Pending):** Frontend and backend development will involve building and integrating a to-do list component.
- **Testing (io8developer - Pending):** Unit tests, integration tests, and end-to-end tests will be implemented.
- **Deployment (io8devops - Pending):** The application will be deployed using the base project's existing deployment infrastructure.
**Revised Constraints:**
- The application should be responsive and user-friendly.
- Strict adherence to base project style guidelines.
**Revised Assumptions:**
- The base project contains a suitable backend API and database.
- The base project has a pre-existing testing framework that can be extended.
**Next Steps:** io8architect will finalize the application architecture and technology stack, followed by io8developer focusing on implementation and testing.

View File

@ -56,4 +56,149 @@
**Assumptions:** **Assumptions:**
* The developer has a basic understanding of Angular and the Clarity Design System. * The developer has a basic understanding of Angular and the Clarity Design System.
* The developer has Node.js and the Angular CLI installed. * The developer has Node.js and the Angular CLI installed.
---
## CODER PLAN UPDATE - 2025-09-24 10:20:24
## io8coder Master Agent Plan - todoapp1 - 2025-09-24 10:20:07
This plan outlines the implementation strategy and timeline for the `todoapp1` project. The plan leverages the existing base project and focuses on extending its capabilities.
**Timeline:**
- **Day 1:** Requirements gathering and architecture design (Analyst and Architect agents).
- **Day 2-3:** Backend development (Developer agent).
- **Day 4-5:** Frontend development (Developer agent).
- **Day 6:** Testing and QA (Developer agent).
- **Day 7:** Deployment (DevOps agent).
**Resources:**
- Cloned base project.
- io8 agents (Analyst, Architect, Developer, DevOps).
- Development environment (IDE, necessary tooling).
- Version control system (Git).
- Deployment infrastructure.
**Tasks & Responsibilities:**
- **Analyst:** Define user stories, acceptance criteria, and non-functional requirements.
- **Architect:** Design the application architecture, choose the technology stack, and define the data model.
- **Developer:** Implement the backend and frontend, write unit and integration tests, and conduct QA testing.
- **DevOps:** Set up the deployment environment, create deployment scripts, and deploy the application.
**Risk Mitigation:**
- Regular communication and updates amongst agents to address any roadblocks.
- Thorough testing and QA to ensure application quality and stability.
- Contingency plans for potential delays or issues.
**Success Metrics:**
- Functional application meeting all defined requirements.
- Application deployed successfully to the chosen environment.
- Timely completion of all milestones within the allocated timeframe.
- Application demonstrates reasonable performance and stability.
---
## CODER PLAN UPDATE - 2025-09-24 10:20:30
## io8coder Master Agent Plan - todoapp1 - 2025-09-24
This plan outlines the implementation strategy for the `todoapp1` project. The plan leverages the existing base project, focusing on incremental development and efficient resource allocation.
**Timeline:**
- **Phase 1 (Day 1):** Requirement analysis, architecture design, technology selection (io8analyst, io8architect).
- **Phase 2 (Days 2-3):** Frontend and backend development (io8developer).
- **Phase 3 (Day 4):** Testing and bug fixing (io8developer).
- **Phase 4 (Day 5):** Deployment and final review (io8devops).
**Resources:**
- Existing base project
- io8analyst agent
- io8architect agent
- io8developer agent
- io8devops agent
**Tasks:**
- [ ] Analyze requirements (io8analyst)
- [ ] Design application architecture (io8architect)
- [ ] Select technologies (io8architect)
- [ ] Develop frontend (io8developer)
- [ ] Develop backend (io8developer)
- [ ] Test application (io8developer)
- [ ] Deploy application (io8devops)
- [ ] Final review and documentation
**Risk Mitigation:**
- Regular communication between agents.
- Continuous integration and continuous deployment (CI/CD) pipeline.
- Backups of the base project and agent outputs.
**Communication:**
- Utilize agent-specific prompt files for clear communication.
- Maintain a central repository for all documents and artifacts.
**Next Steps:** io8pm will create a more detailed sprint plan, and individual agent prompts will be refined.
---
## CODER PLAN UPDATE - 2025-09-24 10:20:37
## io8coder Master Agent Plan Update - todoapp1 - 2025-09-24 10:20:15
This update provides a more detailed plan based on the `todoapp1` project.
**Technology Stack Selection (Day 1):** The Architect agent will make the technology stack selection. This may include determining the database to be used and which framework will be used for the front end. The selection should be documented in the `tech_stack_document.md` file.
**Detailed Task Breakdown (Day 1-7):** The tasks will be broken down further by the Project Manager (PM) agent into smaller, more manageable units. These tasks will be assigned to the appropriate agents (Developer and DevOps) and tracked in a task management system.
**Daily Stand-ups:** Daily stand-up meetings are recommended to track progress, address roadblocks, and ensure communication between the agents.
**Contingency Planning:** A contingency plan should be included to address potential issues. This may include backup plans for technology selection, resource allocation and schedule management.
**Deployment Environment (Day 7):** The DevOps agent will configure the deployment environment (e.g., Heroku, AWS, or a local server) and establish the deployment pipelines. The chosen method will need to be documented within `deployment_config.yml`.
**Post-Deployment Steps:** After deployment, the DevOps agent will implement monitoring and logging to track application performance and identify any issues.
---
## CODER PLAN UPDATE - 2025-09-24 10:20:46
## io8coder Master Agent Plan Update - todoapp1 - 2025-09-24T10:30:00
This update refines the implementation plan based on the revised project breakdown and initial analysis.
**Revised Timeline:**
- **Phase 1 (Day 1):** Finalize architecture design and technology selection (io8architect). Begin frontend development (io8developer).
- **Phase 2 (Day 2):** Continue frontend development, start backend integration (io8developer).
- **Phase 3 (Day 3):** Complete backend integration, initial testing (io8developer).
- **Phase 4 (Day 4):** Thorough testing and bug fixes (io8developer).
- **Phase 5 (Day 5):** Deployment and final review (io8devops).
**Revised Tasks:**
- [ ] Finalize architecture design (io8architect)
- [ ] Select technologies (io8architect)
- [ ] Develop frontend components (io8developer)
- [ ] Develop backend API endpoints (io8developer)
- [ ] Integrate frontend and backend (io8developer)
- [ ] Implement unit tests (io8developer)
- [ ] Implement integration tests (io8developer)
- [ ] Implement end-to-end tests (io8developer)
- [ ] Deploy application (io8devops)
- [ ] Final documentation (io8codermaster)
**Revised Risk Mitigation:**
- Daily stand-up meetings between relevant agents.
- Version control for code and documentation.
- Continuous monitoring for potential issues during deployment.
**Revised Communication:**
- Consistent use of agent-specific prompt files for detailed instructions.
- Regular updates in the central project repository.

View File

@ -60,4 +60,189 @@ The boilerplate will provide the following functional capabilities out-of-the-bo
- Singleton services (e.g., logging, authentication) must be provided in the `CoreModule`. - Singleton services (e.g., logging, authentication) must be provided in the `CoreModule`.
- Reusable components, pipes, and directives that do not have a dependency on services must be declared and exported in the `SharedModule`. - Reusable components, pipes, and directives that do not have a dependency on services must be declared and exported in the `SharedModule`.
- All major application features should be encapsulated within their own lazy-loaded modules. - All major application features should be encapsulated within their own lazy-loaded modules.
- Environment-specific variables (e.g., API endpoints) must be managed in the `environments` folder. - Environment-specific variables (e.g., API endpoints) must be managed in the `environments` folder.
---
## BUSINESS ANALYSIS UPDATE - 2025-09-24 10:21:03
## Analysis Document Update - 2025-09-24T10:45:00
This section details the analysis for the `todoapp1` project, focusing on the specific requirements outlined in the io8codermaster breakdown and plan. The analysis builds upon the existing base project, leveraging its structure and components where possible.
### Project Overview
The `todoapp1` project aims to develop a simple yet functional to-do application. The application will allow users to add, edit, mark as complete, and delete to-do items. This functionality will be supported by a backend API (technology to be determined by the io8architect agent) and a user-friendly frontend UI.
### User Requirements Analysis
Based on the user prompt and the io8codermaster breakdown, the following user requirements have been identified:
* **Add new tasks:** Users should be able to add new tasks to the to-do list with a description and optional due date.
* **Mark tasks as complete:** Users should be able to mark tasks as complete, indicating they have been finished.
* **Edit existing tasks:** Users should be able to edit the description and due date of existing tasks.
* **Delete tasks:** Users should be able to delete tasks from the list.
* **View tasks:** Users should be able to view a list of all tasks, including their status (completed or incomplete).
* **Optional: User Authentication:** The analysis will consider whether user authentication is a requirement.
### Functional Requirements
Based on the user requirements analysis, the following functional requirements are defined:
* **FR-001: Add Task:** The system shall allow users to add a new task with a description and an optional due date.
* **FR-002: Mark Task Complete:** The system shall allow users to mark a task as complete.
* **FR-003: Edit Task:** The system shall allow users to edit the description and due date of an existing task.
* **FR-004: Delete Task:** The system shall allow users to delete a task from the list.
* **FR-005: View Tasks:** The system shall display a list of all tasks, with each task showing its description, due date, and completion status.
### Non-Functional Requirements
* **NFR-001: Performance:** The application should respond quickly to user interactions.
* **NFR-002: Usability:** The application should have a simple and intuitive user interface.
* **NFR-003: Security:** (This will depend on whether authentication is required and will be refined by the io8architect agent.)
### User Stories
* **US-001 (Add Task):** As a user, I want to be able to add a new task to my to-do list so I can keep track of my tasks.
* **Acceptance Criteria:** The new task is added to the list, and the list is updated accordingly. The task should include description and an optional due date.
* **US-002 (Mark Task Complete):** As a user, I want to be able to mark a task as complete so I can track my progress.
* **Acceptance Criteria:** The status of the task is changed to 'completed' in the UI and in the database.
* **US-003 (Edit Task):** As a user, I want to be able to edit an existing task so that I can update my task details if needed.
* **Acceptance Criteria:** The edited task is updated in the UI and in the database, and the list is refreshed.
* **US-004 (Delete Task):** As a user, I want to be able to delete a task so that I can remove completed tasks.
* **Acceptance Criteria:** The task is removed from the list in both the UI and database.
* **US-005 (View Tasks):** As a user, I want to be able to view all my tasks in a list so I can see my tasks easily.
* **Acceptance Criteria:** All tasks are displayed with their description, due date, and status (completed or incomplete).
### Business Rules
Tasks can be added indefinitely. A task cannot be marked as complete and incomplete simultaneously. A task can be deleted at any time.
---
## BUSINESS ANALYSIS UPDATE - 2025-09-24 10:21:11
## Analysis Document Update - 2025-09-24T10:30:00
This section details the analysis for the `todoapp1` project, building upon the existing base project.
### Project Overview
The `todoapp1` project aims to create a simple to-do list application. This will involve a frontend user interface for adding, managing, and viewing to-do items, and a backend API for data persistence. The project leverages the existing base project structure for efficiency, focusing on extending existing capabilities rather than rebuilding from scratch.
### User Requirements Analysis
Based on the user prompt and the `io8codermaster` breakdown, the key user requirements are:
* **Add new to-do items:** Users should be able to add new to-do items with descriptions.
* **View existing to-do items:** Users should be able to view a list of existing to-do items.
* **Mark to-do items as complete:** Users should be able to mark to-do items as completed.
* **Delete to-do items:** Users should be able to delete to-do items.
* **(Optional) User Authentication:** The need for user authentication will be determined in a later stage.
### Functional Requirements Breakdown
The following functional requirements are derived from the user requirements:
* **FR-001: Add ToDo Item:** The system shall allow users to add a new to-do item with a description.
* **FR-002: View ToDo Items:** The system shall display a list of existing to-do items.
* **FR-003: Mark ToDo Item Complete:** The system shall allow users to mark a to-do item as complete.
* **FR-004: Delete ToDo Item:** The system shall allow users to delete a to-do item.
* **FR-005 (Optional): User Authentication:** The system shall implement user authentication if determined necessary.
### Non-Functional Requirements
The following non-functional requirements are considered:
* **NFR-001: Performance:** The application should load quickly and respond efficiently to user input.
* **NFR-002: Usability:** The user interface should be intuitive and easy to use.
* **NFR-003: Security:** The application should handle data securely, especially if user authentication is implemented.
### User Stories
* **US-001:** As a user, I want to add a new to-do item so that I can track my tasks.
* **Acceptance Criteria:** A new to-do item with a description is added to the list and is persistent across sessions.
* **US-002:** As a user, I want to view all my to-do items so that I can see what tasks I need to complete.
* **Acceptance Criteria:** The list of to-do items is displayed accurately and up-to-date.
* **US-003:** As a user, I want to mark a to-do item as complete so that I can track my progress.
* **Acceptance Criteria:** The status of the selected to-do item changes to 'complete'.
* **US-004:** As a user, I want to delete a to-do item so that I can remove completed or irrelevant tasks.
* **Acceptance Criteria:** The selected to-do item is removed from the list and persistence is updated.
### Business Rules
* To-do items cannot have empty descriptions.
* Completed to-do items can be unmarked.
---
## BUSINESS ANALYSIS UPDATE - 2025-09-24 10:21:13
## Analysis Document Update - 2025-09-24T10:55:00
This section provides an updated analysis based on the `todoapp1` user prompt and incorporates feedback from the `.sureai/.io8analyst_agent_todoapp1_todoapp1_20250924_101300.md` file.
### Project Overview Update
The initial project overview is sufficient. No further updates needed at this time.
### User Requirements Analysis Update
The user requirement for optional user authentication is deemed unnecessary for the MVP (Minimum Viable Product) of `todoapp1`. This simplifies the project scope.
### Functional Requirements Update
No changes to the functional requirements are necessary at this time.
### Non-Functional Requirements Update
The Non-Functional Requirement, NFR-003: Security, is deferred until the io8architect agent has determined the technology stack. We will revisit this once we know more about the backend and authentication method.
### User Stories Update
No changes needed to user stories. They sufficiently capture functionality.
### Business Rules Update
The business rules are adequate. No further rules are needed at this time.
### Data Model
The application will require a simple data model to store to-do items. This model will likely include fields for task description, due date (optional), and completion status. The exact structure will depend on the backend technology selected by io8architect.
### Technology Stack Considerations
While the technology stack is outside the scope of the io8Analyst agent's responsibilities, it's important to note that the choice of technologies will significantly impact the non-functional requirements, especially performance and security. Collaboration with the io8architect agent is crucial in selecting the best fit for the `todoapp1` project.
---
## BUSINESS ANALYSIS UPDATE - 2025-09-24 10:21:20
## Analysis Document Update - 2025-09-24T10:45:00
This section provides further analysis for the `todoapp1` project based on the provided documents and user prompt.
### Refined User Requirements
Based on the io8codermaster breakdown and plan, the user requirements are refined as follows:
* **Add new to-do items:** Users should be able to add new to-do items with descriptions, and optionally a due date.
* **View existing to-do items:** Users should be able to view a list of existing to-do items, filtered by completion status and optionally sorted by due date.
* **Mark to-do items as complete:** Users should be able to mark to-do items as completed or incomplete.
* **Delete to-do items:** Users should be able to delete to-do items.
* **Edit to-do items:** Users should be able to edit the description and due date of existing to-do items.
### Updated Functional Requirements
The following functional requirements are updated to reflect the refined user requirements:
* **FR-006: Edit ToDo Item:** The system shall allow users to edit the description and due date of an existing to-do item.
* **FR-007: Filter ToDo Items:** The system shall allow users to filter the list of to-do items by completion status.
* **FR-008: Sort ToDo Items:** The system shall allow users to sort the list of to-do items by due date.
### Data Model Refinement
The data model needs to be updated to include a due date field:
* `id` (unique identifier)
* `description` (text)
* `completed` (boolean)
* `dueDate` (date)
### Additional Considerations
The io8codermaster breakdown mentions optional user authentication. For this initial iteration, user authentication will be omitted to simplify development. However, this could be revisited in future iterations.
### Open Issues
* Determine the appropriate technology stack for the frontend and backend (to be addressed by io8architect).
* Define specific performance requirements and acceptance criteria (to be addressed by io8architect).
* Determine the appropriate testing strategy (to be addressed by io8architect).

View File

@ -135,4 +135,184 @@ Lazy Loading: The architecture strongly encourages the use of lazy-loaded featur
Modular Design: The strict separation of concerns into Core, Shared, and Feature modules makes the codebase easier to manage, test, and scale as the application grows in complexity. Modular Design: The strict separation of concerns into Core, Shared, and Feature modules makes the codebase easier to manage, test, and scale as the application grows in complexity.
State Management: For applications with complex state, a state management library like NgRx or Akita can be easily integrated into this architecture without requiring significant refactoring. State Management: For applications with complex state, a state management library like NgRx or Akita can be easily integrated into this architecture without requiring significant refactoring.
---
## ARCHITECTURE UPDATE - 2025-09-24 10:21:30
## Architecture Document Update - 2025-09-24T10:58:00
This section details the architecture for the `todoapp1` project, building upon the existing Angular Clarity Boilerplate.
### System Overview Update
The `todoapp1` application will consist of a frontend Angular application and a backend API. The frontend will handle user interaction and display of to-do items, while the backend will manage data persistence. The architecture will utilize a RESTful API for communication between the frontend and backend.
### Architecture Pattern Update
The application will follow a three-tier architecture:
1. **Presentation Tier:** The Angular frontend, responsible for user interaction and display of to-do items.
2. **Application Tier:** A RESTful API (backend) responsible for handling business logic and data access.
3. **Data Tier:** A database (to be determined) for persistent storage of to-do items.
### Component Design Update
The Angular frontend will be composed of the following key components:
* **TaskListComponent:** Displays the list of to-do items, including filtering and sorting capabilities.
* **TaskItemComponent:** Represents a single to-do item in the list.
* **AddTaskComponent:** A form for adding new to-do items.
* **EditTaskComponent:** A form for editing existing to-do items.
### Data Architecture Update
The database schema will include the following fields:
* `id` (INT, primary key, auto-increment)
* `description` (VARCHAR(255))
* `dueDate` (DATE, nullable)
* `completed` (BOOLEAN)
The choice of database technology (e.g., SQLite, PostgreSQL, MongoDB) will be determined in the `tech_stack_document.md`.
### API Design Update
The RESTful API will provide the following endpoints:
* `/tasks`: GET (retrieve all tasks), POST (add a new task)
* `/tasks/{id}`: GET (retrieve a single task), PUT (update a task), DELETE (delete a task)
### Security Architecture Update
For the MVP, security considerations are minimal. However, future iterations may require authentication and authorization mechanisms, which will be addressed in subsequent updates.
### Scalability Considerations Update
The application is designed to be scalable. The choice of backend technology and database will be crucial in ensuring scalability for larger numbers of users and tasks. The use of a RESTful API allows for independent scaling of the frontend and backend.
---
## ARCHITECTURE UPDATE - 2025-09-24 10:21:37
## Architecture Document Update - 2025-09-24T10:58:00
This section details the system architecture for the `todoapp1` project, building upon the existing base project's architecture.
### System Overview Update
The `todoapp1` application will utilize a three-tier architecture: a frontend UI, a backend API, and a database. The frontend will be responsible for user interaction, the backend will handle business logic and data access, and the database will store persistent data.
### Architecture Pattern Update
Given the relative simplicity of the `todoapp1` application, a microservices architecture is not necessary. A simpler RESTful API architecture will suffice for this project.
### Component Design Update
The frontend will consist of the following main components:
* **TaskListComponent:** Displays the list of to-do items, allowing users to filter, sort, and view task details.
* **TaskItemComponent:** Represents a single to-do item, allowing users to mark it as complete, edit it, or delete it.
* **AddTaskComponent:** A form allowing users to create new to-do items.
* **EditTaskComponent:** A form for modifying existing to-do items.
The backend API will include endpoints for:
* `/tasks`: GET (retrieve all tasks), POST (add a new task), PUT (update a task), DELETE (delete a task).
### Data Architecture Update
The application will utilize a relational database (PostgreSQL, chosen for its scalability and ease of use). The database schema will include a table named `tasks` with the following columns:
* `id` (SERIAL PRIMARY KEY)
* `description` (TEXT NOT NULL)
* `dueDate` (TIMESTAMP WITH TIME ZONE)
* `completed` (BOOLEAN)
### API Design Update
The API will utilize standard RESTful principles. All endpoints will return JSON data. Error handling will be implemented to provide informative error messages to the client.
### Security Architecture Update
For the MVP, no user authentication will be implemented. This aspect may be revisited in later iterations. However, appropriate input sanitization and validation will be employed on the frontend to prevent common vulnerabilities like XSS.
### Scalability Considerations Update
The chosen architecture is scalable enough to handle a reasonable number of concurrent users. The use of PostgreSQL and efficient database queries should ensure the application remains performant even with a growing number of tasks. Load balancing could be explored in future iterations if significant scaling becomes necessary.
---
## ARCHITECTURE UPDATE - 2025-09-24 10:21:45
## Architecture Document Update - 2025-09-24T11:00:00
This section provides an updated architecture based on the analysis and requirements documents.
### System Overview Update
The system consists of a frontend Angular application consuming a RESTful API built with Node.js and Express.js. Data persistence will be handled by SQLite for the MVP, with potential for future scaling to PostgreSQL or MongoDB.
### Architecture Pattern Update
The three-tier architecture remains unchanged. The system will continue to follow a presentation tier (Angular), application tier (Node.js/Express.js API), and data tier (SQLite) approach.
### Component Design Update
The Angular frontend component design will be updated to incorporate features based on the requirements:
* **TaskListComponent:** This component will display the list of to-do items. It will include features to filter (by completion status) and sort (by due date) the list.
* **TaskItemComponent:** Displays an individual task. Will include buttons or controls for marking as complete, editing and deleting.
* **AddTaskComponent:** A form for adding new tasks, including description and optional due date.
* **EditTaskComponent:** A form for editing existing tasks, allowing modification of description and due date.
### Data Architecture Update
The SQLite database schema will consist of a single table named `tasks` with the following columns:
* `id` (INTEGER, PRIMARY KEY, AUTOINCREMENT)
* `description` (TEXT, NOT NULL)
* `dueDate` (TEXT, DEFAULT NULL)
* `completed` (INTEGER, DEFAULT 0) -- 0 for false, 1 for true
### API Design Update
The API endpoints will be extended to handle additional functionalities:
* `/tasks`: GET (retrieve all tasks), POST (add a new task)
* `/tasks/{id}`: GET (retrieve a single task), PUT (update a task), DELETE (delete a task)
* `/tasks/filter?completed={status}`: GET (retrieve tasks based on completion status)
* `/tasks/sort?orderBy={dueDate}`: GET (retrieve tasks sorted by due date)
### Security Architecture Update
For the MVP, basic security measures will be implemented. Input sanitization will be performed on all user inputs to prevent cross-site scripting (XSS) attacks. Future iterations will incorporate more robust authentication and authorization mechanisms.
### Scalability Considerations Update
For the MVP, SQLite provides sufficient performance. The use of a RESTful API allows for independent scaling of the frontend and backend. Future scalability will be considered by migrating to a more robust database (PostgreSQL or MongoDB) and employing techniques like load balancing and caching.
---
## ARCHITECTURE UPDATE - 2025-09-24 10:21:52
## Architecture Document Update - 2025-09-24T11:08:00
This section details updates to the system architecture based on the refined requirements and analysis for the `todoapp1` project.
### System Overview Update
The three-tier architecture (frontend, backend API, database) remains unchanged. The frontend will interact with the backend API via RESTful endpoints. The backend API will handle data persistence using the chosen database.
### Architecture Pattern Update
The RESTful API architecture remains the optimal choice for this application's simplicity and scalability needs. No major changes are required to the architecture pattern.
### Component Design Update
The frontend components are enhanced to include filtering and sorting functionalities:
* **TaskListComponent:** This component is now responsible for handling filtering and sorting of tasks based on completion status and due date. It will expose methods to allow filtering and sorting options. The filtering and sorting states must be stored in a central store such as Angular's `Rxjs` behavioursubject or `ngrx` store.
* **TaskItemComponent:** No changes to this component are necessary.
* **AddTaskComponent:** This component will allow for the optional input of a due date.
* **EditTaskComponent:** This component will include controls for editing both description and due date.
The backend API will be expanded with additional endpoints to support filtering and sorting:
* `/tasks?completed=[true|false]`: GET (retrieve tasks filtered by completion status)
* `/tasks?orderBy=dueDate&order=[asc|desc]`: GET (retrieve tasks sorted by due date)
### Data Architecture Update
The PostgreSQL database schema remains unchanged from the previous update, including columns for `id`, `description`, `dueDate`, and `completed`. Appropriate indexes will be added to optimize query performance for filtering and sorting.
### API Design Update
The API will continue using standard RESTful principles and JSON data format. Additional endpoints are added to support filtering and sorting of tasks. Detailed API specifications are included in a separate document (API specification document - TBD). Error handling will be further refined based on the chosen backend framework.
### Security Architecture Update
For the MVP, no user authentication is implemented. The focus will be on input validation and sanitization to prevent common vulnerabilities such as XSS (Cross-Site Scripting). Further security considerations will be revisited in later iterations of the application.
### Scalability Considerations Update
The architecture is inherently scalable due to the use of a relational database (PostgreSQL) and a RESTful API. Further scalability improvements can be achieved using techniques like caching and load balancing as the application grows.

View File

@ -59,4 +59,244 @@ The following features and functionalities are explicitly out of scope for the b
- **Authentication/Authorization Logic:** While the architecture supports the implementation of security features, no pre-built authentication or authorization logic is included. - **Authentication/Authorization Logic:** While the architecture supports the implementation of security features, no pre-built authentication or authorization logic is included.
- **State Management:** The boilerplate does not include a state management library (e.g., NgRx, Akita) by default, allowing developers to choose the best solution for their needs. - **State Management:** The boilerplate does not include a state management library (e.g., NgRx, Akita) by default, allowing developers to choose the best solution for their needs.
- **Business Logic:** No specific business logic or application features are included beyond the basic structural components. - **Business Logic:** No specific business logic or application features are included beyond the basic structural components.
- **CI/CD Pipelines:** While the project is ready for CI/CD, no pre-configured pipelines are included. - **CI/CD Pipelines:** While the project is ready for CI/CD, no pre-configured pipelines are included.
---
## PRD UPDATE - 2025-09-24 10:22:07
# Product Requirements Document (PRD) Update - 2025-09-24T11:15:00
## 1. Executive Summary Update
This update focuses on the `todoapp1` project, a simple to-do list application. The application allows users to add, edit, mark as complete, and delete to-do items. The MVP will not include user authentication.
## 2. Product Vision & Strategy Update
The vision is to deliver a functional and user-friendly to-do list application that leverages the Angular Clarity Boilerplate for a robust and scalable foundation. Success will be measured by the successful completion of the user stories and meeting the non-functional requirements.
## 3. Target Users & Personas Update
The target users are individuals needing a simple to-do list application. A persona could be 'Busy Professional', who needs a quick and easy way to manage tasks.
## 5. Solution Overview Update
The solution consists of a frontend Angular application consuming a RESTful API implemented in Node.js/Express.js, using PostgreSQL for data persistence. The frontend will use the Angular Material UI framework for a user-friendly experience.
## 6. Functional Requirements Update
The following functional requirements are added:
- **FR-006: Edit ToDo Item:** The system shall allow users to edit the description and due date of an existing to-do item.
- **FR-007: Filter ToDo Items:** The system shall allow users to filter the list of to-do items by completion status.
- **FR-008: Sort ToDo Items:** The system shall allow users to sort the list of to-do items by due date.
## 8. Epic Stories Update
### Epic 1: Task Management
**Epic Description:** This epic covers the core functionality of adding, editing, completing, and deleting to-do items.
**Business Value:** Provides the core functionality of the to-do application.
**Acceptance Criteria:** All user stories within this epic are completed.
**User Stories:**
- **US-001 (Add Task):** As a user, I want to be able to add a new task to my to-do list so that I can keep track of my tasks.
- **Acceptance Criteria:** The new task is added to the list, and the list is updated accordingly. The task should include description and an optional due date.
- **Story Points:** 3
- **Priority:** High
- **US-002 (Mark Task Complete):** As a user, I want to be able to mark a task as complete so that I can track my progress.
- **Acceptance Criteria:** The status of the task is changed to 'completed' in the UI and the database.
- **Story Points:** 2
- **Priority:** High
- **US-003 (Edit Task):** As a user, I want to be able to edit an existing task so that I can update my task details if needed.
- **Acceptance Criteria:** The edited task is updated in the UI and the database, and the list is refreshed.
- **Story Points:** 3
- **Priority:** Medium
- **US-004 (Delete Task):** As a user, I want to be able to delete a task so that I can remove completed tasks.
- **Acceptance Criteria:** The task is removed from the list in both the UI and the database.
- **Story Points:** 2
- **Priority:** Medium
- **US-005 (View Tasks):** As a user, I want to be able to view all my tasks in a list so I can see my tasks easily.
- **Acceptance Criteria:** All tasks are displayed with their description, due date, and status (completed or incomplete).
- **Story Points:** 2
- **Priority:** High
- **US-006 (Filter Tasks):** As a user, I want to be able to filter tasks by completion status (complete/incomplete) so that I can focus on specific tasks.
- **Acceptance Criteria:** Filtering by complete/incomplete status works correctly and updates the displayed task list.
- **Story Points:** 5
- **Priority:** Medium
- **US-007 (Sort Tasks):** As a user, I want to be able to sort tasks by due date (ascending/descending) so that I can prioritize tasks more effectively.
- **Acceptance Criteria:** Sorting by due date (ascending/descending) updates the displayed task list.
- **Story Points:** 5
- **Priority:** Medium
## 9. User Interface Requirements Update
The UI should follow the Angular Material guidelines and should be intuitive and user-friendly.
## 10. Technical Requirements Update
The application should use the technologies specified in the Technology Stack Document. The API should follow RESTful principles and use JSON for data exchange.
## 11. Success Metrics & KPIs Update
Success will be measured by the number of tasks completed, user engagement, and application stability.
## 12. Risk Assessment Update
Risks include delays in development, integration issues, and potential scalability issues with the database.
## 13. Timeline & Milestones Update
(To be defined in project_plan.md)
## 14. Dependencies & Assumptions Update
This project is dependent on the Angular Clarity Boilerplate. We assume that the chosen technologies are stable and reliable.
---
## PRD UPDATE - 2025-09-24 10:22:17
# Product Requirements Document (PRD) Update - 2025-09-24T11:15:00
## 1. Executive Summary Update - 2025-09-24T11:15:00
This update to the PRD focuses on the `todoapp1` project, a simple to-do list application. The application will allow users to add, edit, mark as complete, and delete to-do items. The application will utilize an Angular frontend and a Node.js/Express.js backend with PostgreSQL database.
## 3. Target Users & Personas Update - 2025-09-24T11:15:00
The target users for `todoapp1` are individuals seeking a simple and effective way to manage their to-do lists. Personas may include students, professionals, or anyone who needs to organize tasks.
## 4. Problem Statement Update - 2025-09-24T11:15:00
Many individuals struggle to effectively manage their to-do lists, leading to missed deadlines and decreased productivity. This application aims to solve this problem by providing a user-friendly interface for creating, organizing, and tracking tasks.
## 5. Solution Overview Update - 2025-09-24T11:15:00
`todoapp1` will provide a web-based to-do list application with the following key features:
* Adding new tasks with descriptions and optional due dates.
* Marking tasks as complete.
* Editing existing tasks.
* Deleting tasks.
* Viewing tasks, filtered by completion status and sorted by due date.
## 6. Functional Requirements Update - 2025-09-24T11:15:00
This section expands on the functional requirements outlined in the previous analysis:
* **FR-006: Add Task:** The system shall allow users to add a new task with a description and an optional due date.
* **FR-007: Mark Task Complete:** The system shall allow users to mark a task as complete.
* **FR-008: Edit Task:** The system shall allow users to edit the description and due date of an existing task.
* **FR-009: Delete Task:** The system shall allow users to delete a task from the list.
* **FR-010: View Tasks:** The system shall display a list of all tasks, including their description, due date, and completion status.
* **FR-011: Filter Tasks:** The system shall allow users to filter the tasks by completion status (completed/incomplete).
* **FR-012: Sort Tasks:** The system shall allow users to sort the tasks by due date (ascending/descending).
## 7. Non-Functional Requirements Update - 2025-09-24T11:15:00
* **NFR-004: Performance:** The application should respond to user actions within 2 seconds.
* **NFR-005: Usability:** The application should have a simple and intuitive interface, easy for users of all technical abilities to use.
* **NFR-006: Security:** Basic input validation and sanitization should prevent common web vulnerabilities. For MVP, no user authentication is required.
* **NFR-007: Scalability:** The application should be scalable to handle a large number of users and tasks in the future. This is addressed by using PostgreSQL and a suitable cloud infrastructure.
## 8. Epic Stories Update - 2025-09-24T11:15:00
### Epic 1: Task Management
**Epic Description:** This epic encompasses all features related to managing to-do tasks, including adding, editing, deleting, and viewing tasks.
**Business Value:** Provides core functionality for users to manage their to-do lists.
**Acceptance Criteria:** All user stories within this epic are completed and successfully tested.
**User Stories:**
- **US-001:** As a user, I want to add a new task to my to-do list so that I can keep track of my tasks.
- **Acceptance Criteria:** New tasks are added to the list, including a description and an optional due date.
- **Story Points:** 3
- **Priority:** High
- **US-002:** As a user, I want to be able to mark a task as complete so that I can track my progress.
- **Acceptance Criteria:** Task status updates correctly in UI and database.
- **Story Points:** 2
- **Priority:** High
- **US-003:** As a user, I want to edit existing tasks so that I can update task details if needed.
- **Acceptance Criteria:** Description and due date are updated correctly.
- **Story Points:** 3
- **Priority:** High
- **US-004:** As a user, I want to be able to delete tasks so that I can remove completed or irrelevant tasks.
- **Acceptance Criteria:** Task is removed from list and database.
- **Story Points:** 2
- **Priority:** High
- **US-005:** As a user, I want to view my to-do list, filtered by completion status.
- **Acceptance Criteria:** Filtering functionality allows user to view only complete or incomplete tasks.
- **Story Points:** 5
- **Priority:** Medium
- **US-006:** As a user, I want to be able to sort my to-do list by due date.
- **Acceptance Criteria:** Sorting functionality works correctly (ascending/descending).
- **Story Points:** 5
- **Priority:** Medium
## 10. Technical Requirements Update - 2025-09-24T11:15:00
* Frontend: Angular, Clarity Design System
* Backend: Node.js, Express.js, TypeScript
* Database: PostgreSQL
* API: RESTful API
* Deployment: Docker, AWS Elastic Beanstalk
## 11. Success Metrics & KPIs Update - 2025-09-24T11:15:00
* Number of users
* Number of tasks created
* User engagement (time spent on the application)
* Task completion rate
## 12. Risk Assessment Update - 2025-09-24T11:15:00
* Risk: Database migration issues. Mitigation: Thorough testing of database interactions.
* Risk: Unexpected performance bottlenecks. Mitigation: Performance monitoring and optimization.
## 13. Timeline & Milestones Update - 2025-09-24T11:15:00
* Week 1: Frontend development, basic task management features
* Week 2: Backend API development, database integration
* Week 3: Filtering and sorting functionality, testing
* Week 4: Deployment to AWS Elastic Beanstalk
---
## PRD UPDATE - 2025-09-24 10:22:19
# Product Requirements Document (PRD) Update - 2025-09-24T11:25:00
## 1. Executive Summary Update
No further updates needed at this time.
## 2. Product Vision & Strategy Update
No further updates needed at this time.
## 3. Target Users & Personas Update
No further updates needed at this time.
## 4. Problem Statement Update
Many individuals struggle to manage their daily tasks efficiently. This application addresses this problem by providing a simple and intuitive interface for managing to-do lists.
## 5. Solution Overview Update
The solution will leverage the Angular framework, Angular Material UI, Node.js/Express.js for the backend API and PostgreSQL for data persistence. This architecture is scalable and robust, ensuring a user-friendly and reliable application.
## 6. Functional Requirements Update
No further updates needed at this time.
## 7. Non-Functional Requirements Update
- **NFR-004: Security:** The application should protect against common web vulnerabilities such as Cross-Site Scripting (XSS) and SQL Injection. Input validation and sanitization will be implemented.
- **NFR-005: Maintainability:** The codebase should be well-documented and easy to maintain and update. This includes using clear naming conventions, comments, and modular design.
- **NFR-006: Performance:** The application should respond quickly to user actions. Performance testing and optimization will be conducted during development and after deployment.
- **NFR-007: Accessibility:** The application should meet WCAG (Web Content Accessibility Guidelines) standards for accessibility.
## 8. Epic Stories Update
No further updates needed at this time.
## 9. User Interface Requirements Update
The UI should be clean, intuitive, and visually appealing, following Material Design guidelines.
## 10. Technical Requirements Update
- **Backend:** Node.js with Express.js, PostgreSQL.
- **Frontend:** Angular, Angular Material UI
- **API:** RESTful API using JSON for data exchange.
## 11. Success Metrics & KPIs Update
- **Task Completion Rate:** Percentage of tasks marked as complete.
- **Active Users:** Number of active users using the application.
- **User Retention:** Percentage of users returning to use the application.
- **Application Stability:** Measured by uptime and error rate.
## 12. Risk Assessment Update
- **Risk 1: Backend Development Delays:** Mitigation: Prioritize backend development and allocate sufficient resources.
- **Risk 2: Frontend Integration Issues:** Mitigation: Implement thorough testing and establish clear communication between frontend and backend developers.
- **Risk 3: Database Scalability Issues:** Mitigation: Use a scalable database like PostgreSQL and implement appropriate indexing and query optimization.
- **Risk 4: User Adoption Issues:** Mitigation: Conduct user testing and feedback sessions to address any usability concerns early on.
## 13. Timeline & Milestones Update
Refer to `.sureai/project_plan.md` for the updated timeline and milestones.
## 14. Dependencies & Assumptions Update
- **Dependency:** Angular Clarity Boilerplate for initial project structure.
- **Assumption:** Developers are proficient in Angular, Node.js, and PostgreSQL.

View File

@ -70,4 +70,162 @@ Prioritization will focus on establishing a stable and usable foundation. **Must
- Integrating a state management library (e.g., NgRx, Akita) with an example implementation. - Integrating a state management library (e.g., NgRx, Akita) with an example implementation.
- Adding more complex example pages (e.g., a settings page, a user profile). - Adding more complex example pages (e.g., a settings page, a user profile).
- Creating custom Angular Schematics to automate the creation of new feature modules that follow the boilerplate's conventions. - Creating custom Angular Schematics to automate the creation of new feature modules that follow the boilerplate's conventions.
- Including pre-configured templates for CI/CD pipelines (e.g., GitHub Actions). - Including pre-configured templates for CI/CD pipelines (e.g., GitHub Actions).
---
## PROJECT PLAN UPDATE - 2025-09-24 10:22:07
# Project Plan Update - 2025-09-24T11:15:00
## Timeline & Milestones
**Phase 1: Setup and Backend Development (2 days)**
- Set up development environment
- Create PostgreSQL database and schema
- Develop backend API endpoints (add, get, update, delete, filter, sort)
- Implement unit tests for backend API
**Phase 2: Frontend Development (3 days)**
- Develop frontend components (TaskListComponent, TaskItemComponent, AddTaskComponent, EditTaskComponent)
- Integrate frontend with backend API
- Implement user interface and styling
- Implement unit and integration tests for frontend
**Phase 3: Testing and Deployment (2 days)**
- Conduct thorough testing (unit, integration, end-to-end)
- Deploy application to Heroku
- Monitor application performance
**Milestones:**
- **Day 2:** Backend API endpoints completed and tested
- **Day 5:** Frontend components integrated with backend API
- **Day 7:** Application deployed and initial testing complete
## Project Management Methodology
Agile methodology (Scrum) will be used to manage the project. The project will be divided into sprints, with daily stand-up meetings and sprint reviews.
## Customized io8pm Workflow
1. **Requirement Gathering:** Complete (based on user prompt and analysis documents)
2. **PRD Creation:** In progress (This document)
3. **Project Planning:** In progress (This document)
4. **Development:** Will be managed using Agile principles
5. **Testing:** Unit, integration, and end-to-end testing will be performed
6. **Deployment:** Deployment to Heroku is planned
7. **Monitoring:** Application performance will be closely monitored after deployment
---
## PROJECT PLAN UPDATE - 2025-09-24 10:22:17
# Project Plan Update - 2025-09-24T11:20:00
## Project Overview
This document outlines the project plan for the `todoapp1` application, a simple to-do list application. The project will leverage the Angular Clarity Boilerplate for the frontend and will utilize Node.js with Express.js for the backend. Data persistence will be handled by a PostgreSQL database. The project will follow an Agile methodology.
## Project Goals
* Develop a functional to-do list application.
* Implement features for adding, editing, deleting, and viewing tasks.
* Integrate filtering and sorting capabilities.
* Deploy the application to a cloud-based environment.
## Methodology
Agile (Scrum) methodology will be used. Sprints will be two weeks long.
## Timeline
**Phase 1: Sprint 1 (Weeks 1-2):** Focus on core functionality (add, edit, delete, view tasks) and backend development.
* Deliverable: Fully functional core features.
* Task Breakdown: Frontend UI development, backend API development, database schema creation, and basic unit tests.
**Phase 2: Sprint 2 (Weeks 3-4):** Add filtering and sorting, complete testing, and deploy.
* Deliverable: Completed application deployed to AWS Elastic Beanstalk.
* Task Breakdown: Implement filtering and sorting, comprehensive testing (unit, integration, end-to-end), deployment to AWS, and final documentation.
## Tasks & Responsibilities
The team will be responsible for the following tasks:
* **Frontend Development:** Develop the user interface using Angular and Clarity.
* **Backend Development:** Develop the API using Node.js and Express.js.
* **Database Management:** Create and maintain the PostgreSQL database.
* **Testing:** Write unit, integration, and end-to-end tests.
* **Deployment:** Deploy the application to AWS Elastic Beanstalk.
## Risk Management
* **Risk:** Database migration issues. **Mitigation:** Thorough testing of database interactions and a rollback plan.
* **Risk:** Unexpected performance bottlenecks. **Mitigation:** Performance testing and optimization strategies.
* **Risk:** Delays in development. **Mitigation:** Regular sprint reviews and adaptation of the project plan based on progress.
## Communication Plan
Regular daily stand-up meetings will be held to track progress and identify potential roadblocks. Weekly sprint reviews will be conducted to demonstrate completed work and plan for the next sprint. A project management tool (e.g., Jira, Asana) will be used to manage tasks and track progress.
## Success Criteria
The project will be considered successful if the following criteria are met:
* The application is fully functional and meets the defined requirements.
* The application is deployed successfully to AWS Elastic Beanstalk.
* The application is thoroughly tested and free of major bugs.
* The application is well-documented.
---
## PROJECT PLAN UPDATE - 2025-09-24 10:22:19
# Project Plan Update - 2025-09-24T11:25:00
## Detailed Task Breakdown
**Phase 1: Backend Development (4 days)**
- Day 1: Setup development environment, create PostgreSQL database and schema, implement basic CRUD (Create, Read, Update, Delete) operations.
- Day 2: Implement API endpoints for adding, retrieving, updating, and deleting tasks.
- Day 3: Implement API endpoints for filtering and sorting tasks.
- Day 4: Implement unit tests for backend API, deploy backend to AWS Elastic Beanstalk.
**Phase 2: Frontend Development (5 days)**
- Day 5: Develop frontend components (TaskList, TaskItem, AddTask, EditTask), connect to backend API.
- Day 6: Implement user interface and styling using Angular Material.
- Day 7: Implement filtering and sorting features.
- Day 8: Implement unit and integration tests.
- Day 9: User Acceptance Testing (UAT).
**Phase 3: Deployment and Monitoring (1 day)**
- Day 10: Deploy application to AWS Elastic Beanstalk, Monitor application performance and address any issues.
**Milestones:**
- **Day 4:** Backend API fully functional and tested.
- **Day 9:** Frontend fully functional and tested, UAT complete.
- **Day 10:** Application deployed to production.
## Resource Allocation
- **Frontend Developer:** 1
- **Backend Developer:** 1
- **Database Administrator:** 1 (Part-time)
## Risk Mitigation Strategies
- **Risk 1 (Backend Delays):** Daily stand-up meetings, regular progress checks, and clear communication between developers.
- **Risk 2 (Frontend Integration):** Frequent testing and integration builds, clear API documentation.
- **Risk 3 (Database Scalability):** Use PostgreSQL with appropriate indexing and query optimization.
- **Risk 4 (User Adoption):** Conduct usability testing and incorporate user feedback.
## Communication Plan
- Daily stand-up meetings.
- Weekly progress reports.
- Regular communication with stakeholders.
## Contingency Planning
- If backend development falls behind schedule, consider prioritizing core features and delaying less critical functionalities.
- If frontend integration is problematic, dedicate extra time for debugging and problem-solving.
- If database performance issues arise, consider optimizing queries and database schema.
- If user adoption is low, gather user feedback to understand and address any issues.
## Project Management Methodology Update
Agile methodology (Scrum) will be used to manage the project. The project will be divided into short sprints, allowing for flexibility and adaptation to changing requirements.
## Project Monitoring
- Application performance will be continuously monitored using logs and metrics. Regular check-ins with the development team to assess progress and address any challenges.

View File

@ -92,4 +92,193 @@ Generated: Tuesday, September 16, 2025
- **Communication Protocol:** The boilerplate shall use Angular's `HttpClient` module to communicate with a backend over HTTP/HTTPS. - **Communication Protocol:** The boilerplate shall use Angular's `HttpClient` module to communicate with a backend over HTTP/HTTPS.
- **API Endpoint Configuration:** The base URL for the backend API shall be configurable via the `environments` files (e.g., `environment.ts`, `environment.prod.ts`). - **API Endpoint Configuration:** The base URL for the backend API shall be configurable via the `environments` files (e.g., `environment.ts`, `environment.prod.ts`).
- **Data Format:** The boilerplate is designed to work with APIs that transact data in **JSON** format. - **Data Format:** The boilerplate is designed to work with APIs that transact data in **JSON** format.
- **Error Handling:** The architecture shall support a centralized way to handle API errors, typically through an `HttpInterceptor` provided in the `CoreModule`. - **Error Handling:** The architecture shall support a centralized way to handle API errors, typically through an `HttpInterceptor` provided in the `CoreModule`.
---
## REQUIREMENTS UPDATE - 2025-09-24 10:21:03
## Requirements Document Update - 2025-09-24T10:45:00
This section details the requirements for the `todoapp1` project, building upon the existing base project's requirements and incorporating the analysis conducted.
### FR-001: Add Task
- **Description:** The system shall allow users to add a new task with a description and an optional due date.
- **Acceptance Criteria:** A new task is added to the list, and the database is updated. The task is displayed in the UI. The task includes a description and an optional due date.
- **Priority:** High
### FR-002: Mark Task Complete
- **Description:** The system shall allow users to mark a task as complete.
- **Acceptance Criteria:** The status of the task is changed to 'completed' in the UI and the database is updated. The UI should visually reflect the status change.
- **Priority:** High
### FR-003: Edit Task
- **Description:** The system shall allow users to edit the description and due date of an existing task.
- **Acceptance Criteria:** The task is updated, and the updated task is reflected both in the UI and database.
- **Priority:** Medium
### FR-004: Delete Task
- **Description:** The system shall allow users to delete a task from the list.
- **Acceptance Criteria:** The task is removed from the UI and database.
- **Priority:** Medium
### FR-005: View Tasks
- **Description:** The system shall display a list of all tasks, with each task showing its description, due date, and completion status.
- **Acceptance Criteria:** All tasks are displayed; each task shows description, due date, and status (completed or incomplete).
- **Priority:** High
### NFR-001: Performance
- **Description:** The application shall respond to user interactions within 2 seconds.
- **Acceptance Criteria:** Performance tests demonstrate average response times less than 2 seconds for all user actions.
### NFR-002: Usability
- **Description:** The application's UI should be intuitive and easy to navigate.
- **Acceptance Criteria:** User testing should be conducted, with at least 80% of users reporting the interface as intuitive and easy to use.
### NFR-003: Security (To be determined by io8architect agent)
- **Description:** TBD
- **Acceptance Criteria:** TBD
---
## REQUIREMENTS UPDATE - 2025-09-24 10:21:11
## Requirements Document Update - 2025-09-24T10:30:00
This section provides further detail on the requirements for the `todoapp1` project.
### FR-001: Add ToDo Item
- **Description:** Allows users to add a new to-do item with a description.
- **Acceptance Criteria:** A new to-do item with a non-empty description is added to the list and persists across sessions. The UI provides clear feedback to the user indicating successful addition.
- **Priority:** High
### FR-002: View ToDo Items
- **Description:** Displays a list of existing to-do items.
- **Acceptance Criteria:** A list of all to-do items, including their descriptions and completion status, is displayed. The list is updated in real-time as items are added, updated, or deleted.
- **Priority:** High
### FR-003: Mark ToDo Item Complete
- **Description:** Allows users to mark a to-do item as complete.
- **Acceptance Criteria:** The status of the selected to-do item is updated to 'complete' in both the UI and the persistent data store. The UI provides clear visual feedback showing the item is complete.
- **Priority:** High
### FR-004: Delete ToDo Item
- **Description:** Allows users to delete a to-do item.
- **Acceptance Criteria:** The selected to-do item is removed from the list and the persistent data store is updated. The UI provides clear visual feedback showing the item is deleted.
- **Priority:** High
### FR-005 (Optional): User Authentication
- **Description:** Implements user authentication (if determined necessary in later stages).
- **Acceptance Criteria:** Users must successfully authenticate before accessing and managing to-do items. Authentication mechanisms will be determined in a later stage by the Architect and Developer agents.
- **Priority:** Medium
### Non-Functional Requirements
### NFR-001: Performance
- **Description:** The application should load quickly and respond efficiently to user input.
- **Acceptance Criteria:** The application should load within 3 seconds and respond to user actions within 1 second. Specific performance metrics will be defined in a later stage.
### NFR-002: Usability
- **Description:** The user interface should be intuitive and easy to use.
- **Acceptance Criteria:** Usability testing will be conducted to ensure the application meets usability standards. Specific metrics will be defined in a later stage.
### NFR-003: Security
- **Description:** The application should handle data securely, especially if user authentication is implemented.
- **Acceptance Criteria:** Security vulnerabilities will be addressed through regular security testing and code reviews. Specific security requirements will be detailed in a later stage.
### Data Requirements
The application will require a data model to store to-do items. This model will include at least the following fields:
* `id` (unique identifier)
* `description` (text)
* `completed` (boolean)
### Interface Requirements
The user interface should be simple and easy to use. It should include clear visual cues to indicate the status of each to-do item. The UI should be responsive and adaptive to various screen sizes.
---
## REQUIREMENTS UPDATE - 2025-09-24 10:21:13
## Requirements Document Update - 2025-09-24T10:55:00
This section updates the requirements document based on the refined analysis and the user prompt.
### FR-001: Add Task Update
No updates necessary. The requirement is clearly defined and actionable.
### FR-002: Mark Task Complete Update
No updates necessary. The requirement is clearly defined and actionable.
### FR-003: Edit Task Update
No updates necessary. The requirement is clearly defined and actionable.
### FR-004: Delete Task Update
No updates necessary. The requirement is clearly defined and actionable.
### FR-005: View Tasks Update
No updates necessary. The requirement is clearly defined and actionable.
### NFR-001: Performance Update
No updates necessary. The requirement is clearly defined and actionable.
### NFR-002: Usability Update
No updates necessary. The requirement is clearly defined and actionable.
### NFR-003: Security Update
**Description:** To be determined by the io8architect agent after the selection of the backend technology stack and authentication method. This will include requirements related to data protection, authorization, and prevention of unauthorized access.
**Acceptance Criteria:** To be determined by the io8architect agent after the definition of specific security measures. This will involve security testing and penetration testing to validate the security measures.
### Data Requirements Update
The application will require a database to store task data. The database schema should include at least the following fields:
* `id` (Unique identifier for each task)
* `description` (Textual description of the task)
* `dueDate` (Date and time when the task is due - optional)
* `completed` (Boolean indicating whether the task is completed)
The specific database technology (e.g., SQLite, PostgreSQL, MongoDB) will be determined by the io8architect agent.
### Interface Requirements Update
The user interface (UI) should be intuitive and easy to use, providing a clear and concise way for users to manage their to-do list. This will be further specified by the io8architect agent during the design phase.
---
## REQUIREMENTS UPDATE - 2025-09-24 10:21:20
## Requirements Document Update - 2025-09-24T10:45:00
This section provides further detail on the requirements for the `todoapp1` project based on the refined analysis.
### FR-006: Edit ToDo Item
- **Description:** Allows users to edit the description and due date of an existing to-do item.
- **Acceptance Criteria:** Users can modify the description and due date of a selected item. Changes are saved and persisted across sessions. UI provides clear feedback indicating successful updates.
- **Priority:** Medium
### FR-007: Filter ToDo Items
- **Description:** Allows users to filter the list of to-do items by completion status.
- **Acceptance Criteria:** Users can filter the list to show only complete or incomplete items. The filter state is persisted across sessions. Clear UI feedback indicates the current filter state.
- **Priority:** Medium
### FR-008: Sort ToDo Items
- **Description:** Allows users to sort the list of to-do items by due date.
- **Acceptance Criteria:** Users can sort the to-do items in ascending or descending order by due date. The sort order is persisted across sessions. Clear UI feedback indicates the current sort order.
- **Priority:** Medium
### Updated Data Requirements
The data model is updated to include a due date field:
* `id` (unique identifier)
* `description` (text)
* `completed` (boolean)
* `dueDate` (date)
### Updated Interface Requirements
The user interface should provide clear controls for adding, editing, deleting, filtering, and sorting to-do items. The UI should clearly display the due date for each item.

View File

@ -36,4 +36,123 @@ Generated: Tuesday, September 16, 2025
* **Code Formatting/Linting:** * **Code Formatting/Linting:**
* **ESLint:** Used for identifying and reporting on patterns in ECMAScript/JavaScript code. * **ESLint:** Used for identifying and reporting on patterns in ECMAScript/JavaScript code.
* **Prettier:** An opinionated code formatter that enforces a consistent style. * **Prettier:** An opinionated code formatter that enforces a consistent style.
* **EditorConfig:** Helps maintain consistent coding styles for multiple developers working on the same project across various editors and IDEs. * **EditorConfig:** Helps maintain consistent coding styles for multiple developers working on the same project across various editors and IDEs.
---
## TECH STACK UPDATE - 2025-09-24 10:21:30
## Technology Stack Document Update - 2025-09-24T10:58:00
This section details the technology stack for the `todoapp1` project.
### Frontend Technologies Update
The frontend will utilize the existing Angular Clarity Boilerplate.
### Backend Technologies Update
For simplicity and rapid development, Node.js with Express.js is recommended for the backend API. This allows for leveraging existing JavaScript skills and frameworks. Alternatively, a serverless approach using AWS Lambda or Google Cloud Functions could be considered for enhanced scalability and cost-effectiveness.
### Database Technologies Update
Given the simplicity of the application, SQLite will be used for the MVP. This provides a lightweight, easy-to-set-up database solution. For future scalability, a migration to a more robust database such as PostgreSQL or MongoDB could be considered.
### Infrastructure Update
For the initial development, a local development environment will be sufficient. For deployment, a cloud-based solution like AWS, Google Cloud, or Heroku could be explored. Docker containers could be considered for easier deployment and environment consistency.
### Development Tools Update
The existing development tools in the base project will be utilized. This includes Git for version control, Jest for unit testing, and a suitable CI/CD pipeline (e.g., GitHub Actions, CircleCI).
---
## TECH STACK UPDATE - 2025-09-24 10:21:37
## Technology Stack Update - 2025-09-24T10:58:00
This section details the technology stack choices for the `todoapp1` project.
### Frontend Technologies Update
* **Framework:** Angular
* **Styling:** Angular Material (chosen for its material design and easy integration with Angular)
* **State Management:** Angular's built-in state management capabilities will be sufficient for the MVP.
### Backend Technologies Update
* **Language:** Node.js with TypeScript (for better type safety and maintainability)
* **Framework:** Express.js (a minimal and flexible Node.js framework)
* **API:** RESTful API
* **ORM:** TypeORM (an ORM that supports PostgreSQL and simplifies database interactions)
### Database Technologies Update
* **Primary Database:** PostgreSQL
### Infrastructure Update
* **Deployment:** Docker for containerization
* **Hosting:** AWS (specifically, an Elastic Beanstalk instance for simple deployment and scaling)
### Development Tools Update
* **Version Control:** Git
* **Testing:** Jest, Cypress (for unit and integration testing)
* **CI/CD:** GitHub Actions
---
## TECH STACK UPDATE - 2025-09-24 10:21:45
## Technology Stack Document Update - 2025-09-24T11:00:00
This section details the technology stack for the `todoapp1` project.
### Frontend Technologies Update
- **Framework:** Angular
- **Styling:** Clarity Design System
- **State Management:** NgRx (optional, for more complex state management)
### Backend Technologies Update
- **Language:** JavaScript
- **Framework:** Node.js with Express.js
- **API:** RESTful API
### Database Technologies Update
- **Primary Database:** SQLite (MVP)
- **Future Considerations:** PostgreSQL or MongoDB for scalability
### Infrastructure Update
- **Local Development:** Local development environment
- **Deployment:** Heroku (Simple Deployment, Easy Scalability)
- **Containerization:** Docker (optional, for consistent environments)
### Development Tools Update
- **Version Control:** Git
- **Testing:** Jest, Cypress (for E2E testing)
- **CI/CD:** GitHub Actions
---
## TECH STACK UPDATE - 2025-09-24 10:21:52
## Technology Stack Update - 2025-09-24T11:08:00
This section details updates to the technology stack based on the refined requirements and analysis.
### Frontend Technologies Update
No changes needed at this time. The previously chosen Angular framework with Angular Material is suitable for the project's requirements.
### Backend Technologies Update
No changes are needed. Node.js with TypeScript and Express.js are confirmed as suitable backend technologies.
### Database Technologies Update
PostgreSQL is confirmed as the database technology of choice. This choice ensures data integrity and scalability while being readily supported by the selected backend technologies.
### Infrastructure Update
Docker for containerization and AWS Elastic Beanstalk for hosting remain the preferred choices. This facilitates easy deployment and scaling.
### Development Tools Update
No changes to the development tools are necessary. Jest and Cypress remain appropriate for unit and integration testing, and GitHub Actions is a suitable CI/CD pipeline.
### Additional Technology Considerations
* **State Management:** Consider `ngrx` or `RxJS` for handling state management within the Angular application to manage filtering and sorting states efficiently.
* **API Documentation:** Tools like Swagger or OpenAPI should be used to generate API documentation. This will improve collaboration and maintainability.
* **Testing:** Thorough unit tests should be written to cover all endpoints of the API and functionality of the Angular frontend. Integration tests will be essential to cover both the frontend and the backend interaction.