Initial commit of io8 project

This commit is contained in:
user 2025-09-25 05:47:37 +00:00
parent 689fe139dd
commit ce5d662625
28 changed files with 1463 additions and 9 deletions

57
.io8project/.state.json Normal file
View File

@ -0,0 +1,57 @@
{
"current_task_id": "6f195de7-3245-48b6-bef4-b341f9f22119",
"completed_tasks": [],
"agent_sequence_index": 0,
"debug_attempts": 0,
"current_agent": "io8project_builder",
"progress_percentage": 0.0,
"context": {
"uploaded_files": [],
"project_path": "/tmp/bmad_output/to_do_app_20250925_053630",
"io8_project_path": "/tmp/bmad_output/to_do_app_20250925_053630/.io8project",
"agent_sequence": [
"io8project_builder",
"io8directory_structure",
"io8codermaster",
"io8analyst",
"io8architect",
"io8pm",
"io8sm",
"io8developer",
"io8devops"
],
"agent_models": [
null,
null,
null,
null,
null,
null,
null,
null,
null
],
"agent_temperatures": [
null,
null,
null,
null,
null,
null,
null,
null,
null
],
"agent_clis": [
"gemini",
"surecli",
"surecli",
"surecli",
"surecli",
"surecli",
"gemini",
"gemini",
"gemini"
]
}
}

View File

@ -0,0 +1 @@
{"project": "metadata"}

View File

@ -0,0 +1,46 @@
# Base project detected - ONLY document existing structure
# DO NOT create any directories or files
# DO NOT run mkdir, touch, or any file creation commands
Existing Directory Structure for 'to do app' project:
```
./
├── .io8project/
│ ├── .state.json
│ └── project_metadata.json
├── cloned base project/
│ ├── .sureai/
│ │ ├── uploads/
│ │ ├── analysis_document.md
│ │ ├── requirements_document.md
│ │ ├── architecture_document.md
│ │ ├── tech_stack_document.md
│ │ ├── prd_document.md
│ │ ├── project_plan.md
│ │ ├── tasks_list.md
│ │ └── sprint_plan.md
│ │ ├── .directory_structure_to_do_app_20250925_053630.md
│ │ ├── .bmad_agent_to_do_app_20250925_053630.md
│ │ ├── .analyst_agent_to_do_app_20250925_053630.md
│ │ ├── .architect_agent_to_do_app_20250925_053630.md
│ │ ├── .pm_agent_to_do_app_20250925_053630.md
│ │ ├── .sm_agent_to_do_app_20250925_053630.md
│ │ ├── .developer_agent_to_do_app_20250925_053630.md
│ │ └── .devops_agent_to_do_app_20250925_053630.md
│ │ ├── .bmad_*.md
│ │ ├── .analyst_*.md
│ │ ├── .architect_*.md
│ │ ├── .developer_*.md
│ │ ├── .devops_*.md
│ │ ├── .pm_*.md
│ │ └── .sm_*.md
│ ├── backend/
│ ├── frontend/
│ ├── deployment_config.yml
│ ├── Dockerfile.backend
│ ├── Dockerfile.frontend
│ └── docker-compose.yml
```
Base project structure documented - no files created except user specific agent prompts

View File

@ -0,0 +1,85 @@
# io8 Business Analyst Agent - Customized for This Project
## Project-Specific Instructions
## Analysis Document Update - 2025-09-25 05:46:30
### Project Overview (To-Do App)
The project aims to develop a simple yet functional to-do application. Based on the user prompt, this application will allow users to create, manage, and track tasks. The application should be user-friendly and intuitive, allowing for efficient task management.
### User Requirements
- Add new tasks with descriptions and due dates.
- Mark tasks as complete.
- Edit or delete existing tasks.
- View a list of tasks, potentially filtered by status (e.g., completed, incomplete).
- Possibly include features like task prioritization and reminders (MVP scope to be determined in subsequent phases).
### Functional Requirements
- FR-001: Task Creation: The system shall allow users to add new tasks with a description and optional due date.
- FR-002: Task Completion: The system shall allow users to mark tasks as complete.
- FR-003: Task Editing: The system shall allow users to edit existing tasks (description, due date).
- FR-004: Task Deletion: The system shall allow users to delete tasks.
- FR-005: Task Listing: The system shall display a list of tasks, optionally filtered by completion status.
### Non-Functional Requirements
- NFR-001: Usability: The application should be easy to use and intuitive.
- NFR-002: Performance: The application should respond quickly to user actions.
- NFR-003: Reliability: The application should be reliable and stable.
### User Stories
- As a user, I want to add new tasks to my to-do list so that I can track my work.
- As a user, I want to mark tasks as complete so that I can track my progress.
- As a user, I want to edit existing tasks so that I can correct mistakes or update information.
- As a user, I want to delete tasks from my list so that I can remove completed or irrelevant items.
- As a user, I want to view a list of my tasks so that I can easily see what I need to do.
### Business Rules
- Tasks cannot have empty descriptions.
- Due dates must be valid dates.
## Requirements Document Update - 2025-09-25 05:46:30
### FR-001: Task Creation
- **Description:** The system shall allow users to create new tasks with a description and an optional due date.
- **Acceptance Criteria:** A new task is successfully added to the task list with a non-empty description. The due date, if provided, is a valid date. The task is correctly persisted (e.g. in local storage or database).
- **Priority:** High
### FR-002: Task Completion
- **Description:** The system shall allow users to mark a task as complete.
- **Acceptance Criteria:** When a user marks a task as complete, its status is updated to reflect this. This change is visually indicated to the user. The change is persisted.
- **Priority:** High
### FR-003: Task Editing
- **Description:** The system shall allow users to edit existing tasks (description and due date).
- **Acceptance Criteria:** Users can modify the description and/or due date of a task. Changes are saved and visually reflected. Invalid due dates are rejected with appropriate feedback to the user.
- **Priority:** Medium
### FR-004: Task Deletion
- **Description:** The system shall allow users to delete tasks.
- **Acceptance Criteria:** A selected task is removed from the task list. The deletion is persisted.
- **Priority:** Medium
### FR-005: Task Listing
- **Description:** The system shall display a list of tasks.
- **Acceptance Criteria:** All tasks are displayed in a clear and organized manner. Completed and incomplete tasks are clearly distinguishable. The list is updatable in real-time.
- **Priority:** High
### NFR-001: Usability
- **Description:** The application should be intuitive and easy to navigate.
- **Acceptance Criteria:** User testing confirms that the application is easy to learn and use. Users complete key tasks quickly and without difficulty.
### NFR-002: Performance
- **Description:** The application should respond quickly to user interactions.
- **Acceptance Criteria:** Page load times are within acceptable limits (<2 seconds). User actions (adding, deleting, completing tasks) are processed quickly and efficiently.
### NFR-003: Reliability
- **Description:** The application should be stable and reliable.
- **Acceptance Criteria:** The application should not crash or experience unexpected errors during normal use. Data persistence is reliable; data is not lost after page refreshes or application restarts.
## Base Agent Prompt Reference
This agent is based on the standard io8analyst agent with project-specific customizations above.
Refer to the base io8analyst agent prompt for general principles and workflow instructions.

View File

@ -0,0 +1,59 @@
# io8 System Architect Agent - Customized for This Project
## Project-Specific Instructions
## Architecture Document Update - 2025-09-25 05:55:00
### System Overview Update
This section describes the architecture for a simple to-do application. The application will follow a straightforward three-tier architecture: Presentation (UI), Application (Business Logic), and Data (Persistence). Given the MVP scope, we will prioritize simplicity and ease of development. Future iterations may consider a more complex microservices architecture if needed.
### Architecture Pattern Update
The chosen architectural pattern for this MVP is a simple Model-View-Controller (MVC) architecture. This is suitable for the relatively straightforward functionality of the to-do app. The separation of concerns between the model (data), view (UI), and controller (business logic) will be clearly defined.
### Component Design Update
- **Task Component:** Responsible for displaying individual tasks. This will include functionalities for marking tasks as complete, editing, and deleting tasks.
- **TaskList Component:** Responsible for displaying the list of tasks. This will include any filtering or sorting logic.
- **TaskCreation Component:** A form to create new tasks, including description and optional due date validation.
- **AppComponent:** The main application component, responsible for routing and potentially housing shared components.
### Data Architecture Update
For the MVP, a simple in-memory data store (e.g., using a JavaScript array or object) or local storage will be sufficient. This approach avoids the complexity of setting up a database for the initial version. The chosen persistence layer will be revisited in future iterations if the application grows beyond this initial scope.
### API Design Update
The API design is not applicable for this MVP as no backend is required. Data interaction will be limited to client-side operations.
### Security Architecture Update
Security measures are minimal for this MVP. Client-side validation is sufficient to ensure data integrity; however, data is stored client-side, making the application vulnerable to loss of data when clearing browser data. This will be re-evaluated in future phases.
### Scalability Considerations Update
For this MVP, scalability concerns are minimal. The chosen technologies and architecture are sufficient for a small-scale, single-user application. Future scalability considerations will be addressed when needed.
## Technology Stack Document Update - 2025-09-25 05:55:00
Given the scope of the MVP for the to-do app, a simpler technology stack is chosen to minimize complexity and development time. A more robust stack could be employed in future iterations.
### Frontend Technologies Update
- **Framework:** React (for its simplicity and component-based approach)
- **Styling:** CSS Modules (for modularity and maintainability)
- **State Management:** Context API (for efficient state management in React)
### Backend Technologies Update
- N/A (No backend required for MVP)
### Database Technologies Update
- N/A (In-memory data or local storage for MVP. A database might be considered for future iterations)
### Infrastructure Update
- N/A (No server-side infrastructure needed for MVP)
### Development Tools Update
- **Version Control:** Git
- **Testing:** Jest and React Testing Library
- **CI/CD:** GitHub Actions (optional, for future iterations)
## Base Agent Prompt Reference
This agent is based on the standard io8architect agent with project-specific customizations above.
Refer to the base io8architect agent prompt for general principles and workflow instructions.

View File

@ -0,0 +1,79 @@
# io8 Code Master Agent - Customized for This Project
## Project-Specific Instructions
## io8coder Master Agent Breakdown - to do app - 2025-09-25 05:45:43
This breakdown details the project phases for the 'to do app' based on the existing base project. The focus is on adapting the existing structure rather than creating a new one.
**Phase 1: Requirements Analysis (io8analyst)**
- Analyze user stories and define detailed requirements for the application's functionality.
- Prioritize features based on importance and feasibility.
- Document all identified requirements within the `requirements_document.md` file.
**Phase 2: Architecture Design (io8architect)**
- Design the application architecture, selecting appropriate technologies (frontend, backend) within the context of the existing base project.
- Detail the chosen technology stack in the `tech_stack_document.md` file.
- Design database schema and APIs, documenting the decisions in the `architecture_document.md` file.
**Phase 3: Development (io8developer)**
- Implement the backend and frontend components based on the architecture design.
- Use the existing `backend/` and `frontend/` directories in the base project.
- Develop the backend using a suitable framework (decision made by the architect and documented) following existing project standards.
- Implement the frontend using a suitable framework (decision made by the architect and documented) following existing project standards.
**Phase 4: Testing and Deployment (io8devops)**
- Perform comprehensive testing of the application.
- Leverage existing testing frameworks within the base project.
- Deploy the application using the existing base project deployment configuration files (`deployment_config.yml`, `Dockerfile.backend`, `Dockerfile.frontend`, `docker-compose.yml`).
**Constraints:**
- Adhere strictly to the existing base project structure; no new directories should be created.
- Utilize existing configuration files where possible.
- Prioritize features for MVP (Minimum Viable Product).
**Milestones:**
- Completion of Requirements Analysis (End of Day 1)
- Completion of Architecture Design (End of Day 2)
- Completion of Development (End of Day 7)
- Completion of Testing and Deployment (End of Day 10)
## io8coder Master Agent Implementation Plan - to do app - 2025-09-25 05:45:43
This plan outlines the implementation schedule and resource allocation for the 'to do app' project, leveraging the existing base project.
**Timeline:**
- **Day 1:** Requirements Gathering and Analysis (io8analyst)
- **Day 2:** Architectural Design and Technology Stack Selection (io8architect)
- **Day 3-7:** Development (io8developer) - Frontend and Backend Development. Focus on core features.
- **Day 8-9:** Testing (io8devops) - Unit, Integration and End-to-End testing.
- **Day 10:** Deployment and final review (io8devops)
**Resources:**
- Existing base project structure and files.
- io8analyst, io8architect, io8developer, io8devops agents.
**Tasks:**
- **Task 1:** (io8analyst) Define user stories and create a detailed requirements document (`requirements_document.md`).
- **Task 2:** (io8architect) Define the technical architecture and technology stack (`architecture_document.md` and `tech_stack_document.md`).
- **Task 3:** (io8developer) Implement the application backend and frontend, adhering to the defined architecture.
- **Task 4:** (io8devops) Test and deploy the application to a staging/production environment.
**Risk Mitigation:**
- Regular communication and coordination among agents.
- Frequent code reviews to ensure quality and adherence to coding standards.
- Version control using Git to manage code changes and facilitate collaboration.
**Contingency Plan:**
- If any unexpected issues arise during development or testing, adjust the timeline and re-evaluate the task assignments.
- Regular check-ins to prevent scope creep.
**Communication:**
- Utilize shared documents to track progress and share updates.
- Daily stand-up meetings to address any roadblocks and keep everyone synchronized.
## Base Agent Prompt Reference
This agent is based on the standard io8codermaster agent with project-specific customizations above.
Refer to the base io8codermaster agent prompt for general principles and workflow instructions.

View File

@ -0,0 +1,154 @@
# io8 Project Manager Agent - Customized for This Project
## Project-Specific Instructions
## 1. Executive Summary
[2025-09-25T12:07:00] This document outlines the product requirements for a simple to-do application. The application will allow users to create, manage, and track tasks, focusing on a minimal viable product (MVP) with potential for future expansion.
## 2. Product Vision & Strategy
[2025-09-25T12:07:00] The vision is to provide a user-friendly and efficient to-do application for managing daily tasks. The strategy is to focus on an MVP with core functionalities, ensuring a smooth user experience and laying the groundwork for future feature additions.
## 3. Target Users & Personas
[2025-09-25T12:07:00] The target user is an individual seeking a simple and intuitive to-do application to manage personal or work tasks. Personas will be developed in a future iteration.
## 4. Problem Statement
[2025-09-25T12:07:00] Users lack a simple and effective tool for managing their tasks, leading to disorganization and decreased productivity. This application addresses this problem by providing a user-friendly interface for creating, tracking, and managing tasks.
## 5. Solution Overview
[2025-09-25T12:07:00] A web-based to-do application that allows users to add, edit, delete, and mark tasks as complete. The MVP will include basic task management features, with potential for future extensions such as task prioritization and reminders.
## 6. Functional Requirements
[2025-09-25T12:07:00]
- **FR-001: Task Creation:** The system shall allow users to create new tasks with a description and an optional due date. The description field is mandatory. Due dates must be valid dates.
- **FR-002: Task Completion:** The system shall allow users to mark tasks as complete.
- **FR-003: Task Editing:** The system shall allow users to edit existing tasks (description and due date).
- **FR-004: Task Deletion:** The system shall allow users to delete tasks.
- **FR-005: Task Listing:** The system shall display a list of tasks. The list should allow for filtering by completion status (complete/incomplete).
## 7. Non-Functional Requirements
[2025-09-25T12:07:00]
- **NFR-001: Usability:** The application should be intuitive and easy to use.
- **NFR-002: Performance:** The application should be responsive to user actions.
- **NFR-003: Reliability:** The application should be stable and data should be persistently stored.
- **NFR-004: Security:** Data should be protected using appropriate client-side security measures. (Further enhancements in future iterations)
## 8. Epic Stories
[2025-09-25T12:07:00]
### Epic 1: Core Task Management
**Epic Description:** Implement the core functionalities for creating, managing, and tracking tasks.
**Business Value:** Provides the fundamental value proposition of the application task management.
**Acceptance Criteria:** All functional requirements (FR-001 through FR-005) are met.
**User Stories:**
- **US-001:** Add a New Task
- **As a** user
- **I want to** add a new task with a description and optional due date
- **So that** I can track my tasks.
- **Acceptance Criteria:**
- [ ] A new task is added to the list with a description and optionally a due date.
- [ ] The description field is validated to prevent empty entries.
- [ ] Due date validation ensures it's a valid date format.
- **Story Points:** 5
- **Priority:** High
- **US-002:** Mark Task as Complete
- **As a** user
- **I want to** mark a task as complete
- **So that** I can track my progress.
- **Acceptance Criteria:**
- [ ] A task's completion status is updated.
- [ ] The UI reflects the change in status.
- **Story Points:** 3
- **Priority:** High
- **US-003:** Edit Existing Task
- **As a** user
- **I want to** edit an existing task's description and due date
- **So that** I can correct mistakes or update information.
- **Acceptance Criteria:**
- [ ] Existing task information is updated.
- [ ] Description and due date fields are validated.
- [ ] The UI reflects the changes.
- **Story Points:** 5
- **Priority:** High
- **US-004:** Delete Task
- **As a** user
- **I want to** delete a task
- **So that** I can remove completed or irrelevant items.
- **Acceptance Criteria:**
- [ ] The selected task is removed from the list.
- [ ] The UI reflects the removal.
- **Story Points:** 3
- **Priority:** High
- **US-005:** View Task List
- **As a** user
- **I want to** view a list of all tasks, filtered by completion status
- **So that** I can easily see what I need to do.
- **Acceptance Criteria:**
- [ ] A list of all tasks is displayed.
- [ ] Tasks can be filtered to show only complete or incomplete tasks.
- **Story Points:** 5
- **Priority:** High
## 9. User Interface Requirements
[2025-09-25T12:07:00] A clean, intuitive interface is required. Wireframes and mockups will be created in the design phase. The UI should be responsive across different screen sizes.
## 10. Technical Requirements
[2025-09-25T12:07:00] React.js with local storage for data persistence. Detailed technical specifications are in the architecture and technology stack documents. The application should be easily testable.
## 11. Success Metrics & KPIs
[2025-09-25T12:07:00] Key metrics include user engagement (number of tasks created, edited, completed), user satisfaction, and the number of active users.
## 12. Risk Assessment
[2025-09-25T12:07:00] Potential risks include data loss due to local storage reliance and scalability limitations. Mitigation strategies will be defined in the project plan.
## 13. Timeline & Milestones
[2025-09-25T12:07:00] A detailed timeline will be defined in the project plan.
## 14. Dependencies & Assumptions
[2025-09-25T12:07:00] The primary assumption is that basic React development skills are available. The project is not dependent on any external services for this MVP.
## Project Plan: To-Do App
[2025-09-25T12:08:00] This plan outlines the development process for the To-Do App MVP.
### Project Methodology:
[2025-09-25T12:08:00] Agile (Scrum) methodology will be used, emphasizing iterative development and frequent feedback.
### Project Phases:
[2025-09-25T12:08:00]
1. **Inception (1 day):** Finalize requirements, confirm technology stack, set up project environment.
2. **Design (2 days):** Create wireframes, UI mockups, and database schema (if applicable for future iterations).
3. **Development (5 days):** Develop the core features (task creation, completion, editing, deletion, display). Focus on unit and functional testing.
4. **Testing & QA (2 days):** Thoroughly test the application for functionality, usability, and performance. Address bugs and refine the application based on testing results.
5. **Deployment (1 day):** Deploy the application to a suitable platform (e.g., GitHub Pages, Netlify).
### Timeline & Milestones:
[2025-09-25T12:08:00]
- **Milestone 1 (Day 1):** Project setup and requirements finalized.
- **Milestone 2 (Day 3):** Design complete (wireframes, mockups).
- **Milestone 3 (Day 8):** Core functionality development complete.
- **Milestone 4 (Day 10):** Testing and QA complete.
- **Milestone 5 (Day 11):** Application deployed.
### Resource Allocation:
[2025-09-25T12:08:00] One developer will handle the entire development process for this MVP.
### Risk Mitigation Strategies:
[2025-09-25T12:08:00]
- **Data Loss:** Implement proper error handling and backup mechanisms for local storage. Instruct users on the importance of not clearing browser cache/storage.
- **Scalability:** While scalability isn't a major concern for the MVP, design decisions will be made to facilitate future scalability.
- **Testing:** Thorough unit and integration tests will help prevent issues and improve application reliability.
### Communication Plan:
[2025-09-25T12:08:00] Regular updates and progress reports will be provided. Issues will be tracked and addressed using a suitable issue tracker (e.g., GitHub Issues).
### Success Metrics:
[2025-09-25T12:08:00] Successful completion of all milestones, user satisfaction (measured through feedback or surveys in future iterations), and a stable and functional MVP.
## Base Agent Prompt Reference
This agent is based on the standard io8pm agent with project-specific customizations above.
Refer to the base io8pm agent prompt for general PM principles and workflow instructions.

View File

@ -0,0 +1,56 @@
# io8 Project Builder Plan for to_do_app_20250925_053630
This document outlines the project builder plan for the `to_do_app_20250925_053630` project, orchestrated using io8 MCP.
## 1. High-Level Scaffolding Plan
### Backend (Authsec_Springboot_sqlite)
* **Core Application Structure**: A Spring Boot application with security and SQLite integration.
* **RESTful API**: Endpoints for managing ToDo items (Create, Read, Update, Delete).
* **Database Integration**: JPA/Hibernate for interacting with the SQLite database.
* **Security**: Authentication and authorization mechanisms provided by Authsec.
* **Module**: `to_do_app_20250925_053630-b`
### Frontend (Angular Clarity)
* **User Interface**: An Angular application with Clarity Design System components.
* **Routing**: Navigation for different views (e.g., list all ToDo items, view/edit a single ToDo item, create new ToDo item).
* **Service Layer**: Angular services to interact with the backend RESTful API.
* **Components**: Components for displaying, adding, editing, and deleting ToDo items.
* **Module**: `to_do_app_20250925_053630-f`
## 2. Directory and File Scaffolding Strategy
The project structure will follow the standard io8 MCP generated layout, which includes:
* **Root Directory**: `/tmp/bmad_output/to_do_app_20250925_053630/`
* **Backend Module**: `to_do_app_20250925_053630-to_do_app_20250925_053630-b-b/authsec_springboot/backend/`
* `src/main/java/com/realnet/`: Contains Java source code for controllers, services, entities, repositories.
* `src/main/resources/`: Contains application properties, database scripts, and other resources.
* `pom.xml`: Maven build configuration.
* **Frontend Module**: `to_do_app_20250925_053630-to_do_app_20250925_053630-f-f/authsec_angular/frontend/angular-clarity-master/`
* `src/app/`: Contains Angular components, services, modules, and routing.
* `src/environments/`: Environment-specific configurations.
* `angular.json`, `package.json`: Angular and Node.js project configurations.
* **.sureai/io8_mcp/responses**: This directory will store all MCP tool outputs in JSON format.
* `create_project.out`: Contains details of the created io8 project.
* `build_app.out`: Contains the response from the application build process.
* `git_pull_successful.out`: A marker file indicating successful git pull.
* `create_wireframe.out`: Contains details of the created wireframe.
## 3. Build Tools and Scripts
* **io8 MCP**: Used for initial project creation, application building, and wireframe generation.
* **Maven (Backend)**: For building the Spring Boot backend application. The `pom.xml` will be pre-configured by io8.
* **Angular CLI (Frontend)**: For building, serving, and testing the Angular frontend application. `package.json` will contain standard Angular scripts.
* **Git**: For version control and pulling the generated code from the Gitea repository.
## 4. Pre-Developer Checks
Before a developer begins working on the project, the following checks should be performed:
* **`create_project.out`**: Verify that the io8 project creation was successful and extract `projectId`, `backendResp.id`, `moduleResp.id`, and `gitea_url`.
* **`build_app.out`**: Confirm that the application build process was initiated successfully.
* **`git_pull_successful.out`**: Ensure that the initial code pull from the Gitea repository was successful and the local repository is populated.
* **`create_wireframe.out`**: Validate that the wireframe for the ToDo item was created as expected, including the correct fields and types.
* **Local Environment Setup**: Ensure Java (for Spring Boot), Node.js/npm (for Angular), and Git are installed and configured correctly.
* **IDE Setup**: Recommend appropriate IDEs (e.g., IntelliJ IDEA for Java, VS Code for Angular) with necessary plugins.

View File

@ -0,0 +1,5 @@
{
"status": "success",
"message": "Build request submitted successfully",
"response_text": "Insert In job Pro Successfully done"
}

View File

@ -0,0 +1,104 @@
{
"projectResp": {
"createdAt": "2025-09-25 05:45:44",
"updatedAt": "2025-09-25 05:45:46",
"createdBy": 10007301,
"updatedBy": 10007301,
"accountId": 122,
"id": 48429,
"owner": "Super Admin",
"owned_by": 10007301,
"projectName": "to_do_app_20250925_053630",
"description": null,
"copyTo": null,
"technologyStack": null,
"projectPrefix": null,
"major_version": null,
"minor_version": null,
"upload_Logo_name": null,
"upload_Logo_path": null,
"namespace": null,
"tags": null,
"category": null,
"accessibility": false,
"is_archived": false,
"is_active": true,
"is_aged": null,
"is_fav": null,
"favCnt": null,
"is_stared": null,
"staredCnt": null,
"is_watchlisted": null,
"watchlistedCnt": null,
"is_futuristic": null,
"futuristicCnt": null,
"is_pinned": null,
"pinnedCnt": null,
"private_deployid": null,
"isprivatedeploy": false,
"registery_profileid": 3,
"isregisteryprofile": true,
"github_profileid": null,
"isgithubprofile": false,
"modules": null,
"favourite": null,
"archived": null,
"workflow_id": 53,
"gitea_url": "http://157.66.191.31:3000/risadmin_prod/to_do_app_20250925_053630.git",
"isfirstbuild": false,
"company_Display_Name": null
},
"backendResp": {
"id": 2508,
"backend_service_name": "to_do_app_20250925_053630-b",
"techstack": "Authsec_Springboot_sqlite",
"description": null,
"proj_id": 48429,
"isprimary": true,
"db_id": 2695
},
"moduleResp": {
"createdAt": "2025-09-25 05:45:46",
"updatedAt": "2025-09-25 05:45:46",
"createdBy": null,
"updatedBy": null,
"accountId": null,
"id": 48438,
"moduleName": "to_do_app_20250925_053630-f",
"description": null,
"modulePrefix": null,
"copyTo": null,
"technologyStack": "Angular Clarity",
"is_active": true,
"tags": null,
"readme": false,
"dbName": null,
"dbUserName": null,
"dbPassword": null,
"portNumber": null,
"microservice": false,
"portaldeployment": false,
"parentrepo": null,
"copy_baseproj": false,
"loginservice": false,
"testing": false,
"type": null,
"rn_fb_headers": null,
"rn_report_builder": null,
"projectId": 0,
"projectName": null
},
"dbResp": {
"id": 2695,
"db_name": "to_do_app_20250925_053630-d",
"db_type": null,
"db_username": "root",
"db_password": "root",
"port_no": 3306,
"proj_id": 48429,
"techstack": "MySQL",
"host_name": null,
"existing_db": false,
"isdefault": false
}
}

View File

@ -0,0 +1,46 @@
{
"createdAt": "2025-09-25 05:46:26",
"updatedAt": "2025-09-25 05:46:26",
"createdBy": 10007301,
"updatedBy": 10007301,
"accountId": null,
"id": 7727,
"techStack": "Authsec_Springboot_sqlite",
"objectType": "form",
"subObjectType": "only header",
"uiName": "ToDoItem",
"formType": null,
"tableName": null,
"lineTableName": null,
"multilineTableName": null,
"formCode": "ToDoItem_view",
"jspName": null,
"controllerName": "ToDoItemController",
"serviceName": null,
"serviceImplName": null,
"daoName": null,
"daoImplName": null,
"build": false,
"updated": false,
"menuName": null,
"headerName": "ToDoItem",
"convertedTableName": null,
"package_name": null,
"backend_id": 2508,
"testing": false,
"child_form": false,
"add_tomobile": false,
"editable": true,
"is_active": true,
"is_notification": null,
"add_to_card": false,
"card_id": null,
"add_to_apiregistery": null,
"isrealm": false,
"realm_id": null,
"notification_msg": null,
"table_type": null,
"type": null,
"rn_cff_actionBuilder": null,
"serviceTechid": null
}

View File

@ -0,0 +1 @@
Git pull successful.

1
Dockerfile.backend Normal file
View File

@ -0,0 +1 @@
# Placeholder - DevOps will fill this later

1
Dockerfile.frontend Normal file
View File

@ -0,0 +1 @@
# Placeholder - DevOps will fill this later

0
backend/.gitkeep Normal file
View File

1
deployment_config.yml Normal file
View File

@ -0,0 +1 @@
# Placeholder - DevOps will fill this later

1
docker-compose.yml Normal file
View File

@ -0,0 +1 @@
# Placeholder - DevOps will fill this later

0
frontend/.gitkeep Normal file
View File

1
nginx.conf Normal file
View File

@ -0,0 +1 @@
# Placeholder - DevOps will fill this later

View File

@ -57,4 +57,133 @@ This document outlines the directory structure for the Angular Clarity boilerpla
- `angular.json`: The configuration file for the Angular CLI.
- `package.json`: Defines the project's dependencies and scripts.
- `README.txt`: The main documentation file for the project.
- `tsconfig.json`: The configuration file for the TypeScript compiler.
- `tsconfig.json`: The configuration file for the TypeScript compiler.
---
## DIRECTORY STRUCTURE UPDATE - 2025-09-25 05:45:37
# Directory Structure Analysis for 'to do app'
This document details the directory structure for the 'to do app' project, building upon the existing cloned base project. No new directories or files will be created; this analysis focuses solely on documenting the existing structure and how it aligns with the 'to do app' requirements.
**Existing Structure (Documented, Not Created):**
The base project structure is assumed to exist and is documented as follows (this is NOT a creation instruction):
```
./
├── .io8project/
│ ├── .state.json
│ └── project_metadata.json
├── cloned base project/
│ ├── .sureai/
│ │ ├── uploads/
│ │ ├── .directory_structure_to_do_app_20250925_053630.md
│ │ ├── .bmad_agent_to_do_app_20250925_053630.md
│ │ ├── .analyst_agent_to_do_app_20250925_053630.md
│ │ ├── .architect_agent_to_do_app_20250925_053630.md
│ │ ├── .pm_agent_to_do_app_20250925_053630.md
│ │ ├── .sm_agent_to_do_app_20250925_053630.md
│ │ ├── .developer_agent_to_do_app_20250925_053630.md
│ │ ├── .devops_agent_to_do_app_20250925_053630.md
│ │ ├── .bmad_*.md
│ │ ├── .analyst_*.md
│ │ ├── .architect_*.md
│ │ ├── .developer_*.md
│ │ ├── .devops_*.md
│ │ ├── .pm_*.md
│ │ ├── .sm_*.md
│ │ ├── analysis_document.md
│ │ ├── requirements_document.md
│ │ ├── architecture_document.md
│ │ ├── tech_stack_document.md
│ │ ├── prd_document.md
│ │ ├── project_plan.md
│ │ └── tasks_list.md
│ │ └── sprint_plan.md
├── backend/
├── frontend/
├── deployment_config.yml
├── Dockerfile.backend
├── Dockerfile.frontend
└── docker-compose.yml
```
**Project Organization Approach:**
Given the 'to do app' specification, a straightforward approach will be used, leveraging the existing base project structure. The focus will be on efficient task management and data storage. The backend will likely manage data persistence (database interaction), while the frontend will handle user interface elements.
**File Structure Planning Framework:**
- **Backend (`backend/`):** This directory will contain server-side logic, database interaction code, and API endpoints. Specific subdirectories might be created (e.g., `models/`, `controllers/`, `routes/`) depending on the framework used (e.g., Express.js, Django). These will be created by the developer agent based on the framework chosen in the architecture document.
- **Frontend (`frontend/`):** This directory will house client-side code, including the user interface (UI), styling (CSS), and potentially JavaScript frameworks (React, Angular, Vue.js). Again, the developer agent will determine the precise subdirectory structure based on the chosen framework. This may already exist in the cloned base project.
- **Configuration Files (root level):** Existing configuration files (`deployment_config.yml`, `Dockerfile.backend`, `Dockerfile.frontend`, `docker-compose.yml`) will be leveraged. The DevOps agent might modify or extend these based on the specific needs of the 'to do app'.
**Configuration File Strategy:**
The existing configuration files will be adapted to deploy and manage a to-do application. Environment variables will be used to handle sensitive data (database credentials, API keys).
**Customized Directory Structure Workflow:**
1. **Leverage Base Project:** The existing base project provides a solid foundation. No directories or files will be created unnecessarily.
2. **Agent Collaboration:** Different agents (Analyst, Architect, Developer, DevOps) will contribute to the project, utilizing the existing structure.
3. **Documentation:** This document serves as a blueprint for how the existing structure meets the 'to do app' project requirements.
4. **Developer Focus:** The developer agent will populate the `backend/` and `frontend/` directories with appropriate code and framework-specific structures. No additional directory creation instructions are needed at this stage.
5. **DevOps Focus:** The DevOps agent will adjust the root-level configuration files for deployment.
**Conclusion:**
The existing base project structure is sufficient for this 'to do app'. This analysis clarifies how the existing structure is adapted, rather than creating a new one. Subsequent agents will populate the directories with code and documentation.
---
## DIRECTORY STRUCTURE UPDATE - 2025-09-25 05:45:43
# Base project detected - ONLY document existing structure
# DO NOT create any directories or files
# DO NOT run mkdir, touch, or any file creation commands
Existing Directory Structure for 'to do app' project:
```
./
├── .io8project/
│ ├── .state.json
│ └── project_metadata.json
├── cloned base project/
│ ├── .sureai/
│ │ ├── uploads/
│ │ ├── analysis_document.md
│ │ ├── requirements_document.md
│ │ ├── architecture_document.md
│ │ ├── tech_stack_document.md
│ │ ├── prd_document.md
│ │ ├── project_plan.md
│ │ ├── tasks_list.md
│ │ └── sprint_plan.md
│ │ ├── .directory_structure_to_do_app_20250925_053630.md
│ │ ├── .bmad_agent_to_do_app_20250925_053630.md
│ │ ├── .analyst_agent_to_do_app_20250925_053630.md
│ │ ├── .architect_agent_to_do_app_20250925_053630.md
│ │ ├── .pm_agent_to_do_app_20250925_053630.md
│ │ ├── .sm_agent_to_do_app_20250925_053630.md
│ │ ├── .developer_agent_to_do_app_20250925_053630.md
│ │ └── .devops_agent_to_do_app_20250925_053630.md
│ │ ├── .bmad_*.md
│ │ ├── .analyst_*.md
│ │ ├── .architect_*.md
│ │ ├── .developer_*.md
│ │ ├── .devops_*.md
│ │ ├── .pm_*.md
│ │ └── .sm_*.md
│ ├── backend/
│ ├── frontend/
│ ├── deployment_config.yml
│ ├── Dockerfile.backend
│ ├── Dockerfile.frontend
│ └── docker-compose.yml
```
Base project structure documented - no files created except user specific agent prompts

View File

@ -65,4 +65,66 @@
* **Phase 4: Build & Deployment**
* Build the application for production.
* Deploy to a hosting service.
* Set up CI/CD pipelines for automated builds and deployments.
* Set up CI/CD pipelines for automated builds and deployments.
---
## CODER BREAKDOWN UPDATE - 2025-09-25 05:46:00
## io8coder Master Agent Breakdown - to do app - 2025-09-25 05:45:43
This breakdown details the project phases for the 'to do app' based on the existing base project. The focus is on adapting the existing structure rather than creating a new one.
**Phase 1: Requirements Analysis (io8analyst)**
- Analyze user stories and define detailed requirements for the application's functionality.
- Prioritize features based on importance and feasibility.
- Document all identified requirements within the `requirements_document.md` file.
**Phase 2: Architecture Design (io8architect)**
- Design the application architecture, selecting appropriate technologies (frontend, backend) within the context of the existing base project.
- Detail the chosen technology stack in the `tech_stack_document.md` file.
- Design database schema and APIs, documenting the decisions in the `architecture_document.md` file.
**Phase 3: Development (io8developer)**
- Implement the backend and frontend components based on the architecture design.
- Use the existing `backend/` and `frontend/` directories in the base project.
- Develop the backend using a suitable framework (decision made by the architect and documented) following existing project standards.
- Implement the frontend using a suitable framework (decision made by the architect and documented) following existing project standards.
**Phase 4: Testing and Deployment (io8devops)**
- Perform comprehensive testing of the application.
- Leverage existing testing frameworks within the base project.
- Deploy the application using the existing base project deployment configuration files (`deployment_config.yml`, `Dockerfile.backend`, `Dockerfile.frontend`, `docker-compose.yml`).
**Constraints:**
- Adhere strictly to the existing base project structure; no new directories should be created.
- Utilize existing configuration files where possible.
- Prioritize features for MVP (Minimum Viable Product).
**Milestones:**
- Completion of Requirements Analysis (End of Day 1)
- Completion of Architecture Design (End of Day 2)
- Completion of Development (End of Day 7)
- Completion of Testing and Deployment (End of Day 10)
---
## CODER BREAKDOWN UPDATE - 2025-09-25 05:46:04
## Phase 5: Documentation (io8codermaster)
- Update this document with any changes or additions to the project plan and breakdown.
- Add detailed documentation for the application's functionality, including user guides and API specifications.
- Ensure all documentation is up-to-date and reflects the final state of the application.
- Ensure all files are documented in the .sureai directory, in accordance with the base project's documentation standards.
**Milestones (Updated):**
- Completion of Documentation (End of Day 12)
**Constraints (Updated):**
- All documentation must be consistently formatted and easily accessible.
- Documentation must include diagrams, code examples, and clear instructions.

View File

@ -56,4 +56,69 @@
**Assumptions:**
* The developer has a basic understanding of Angular and the Clarity Design System.
* The developer has Node.js and the Angular CLI installed.
* The developer has Node.js and the Angular CLI installed.
---
## CODER PLAN UPDATE - 2025-09-25 05:46:00
## io8coder Master Agent Implementation Plan - to do app - 2025-09-25 05:45:43
This plan outlines the implementation schedule and resource allocation for the 'to do app' project, leveraging the existing base project.
**Timeline:**
- **Day 1:** Requirements Gathering and Analysis (io8analyst)
- **Day 2:** Architectural Design and Technology Stack Selection (io8architect)
- **Day 3-7:** Development (io8developer) - Frontend and Backend Development. Focus on core features.
- **Day 8-9:** Testing (io8devops) - Unit, Integration and End-to-End testing.
- **Day 10:** Deployment and final review (io8devops)
**Resources:**
- Existing base project structure and files.
- io8analyst, io8architect, io8developer, io8devops agents.
**Tasks:**
- **Task 1:** (io8analyst) Define user stories and create a detailed requirements document (`requirements_document.md`).
- **Task 2:** (io8architect) Define the technical architecture and technology stack (`architecture_document.md` and `tech_stack_document.md`).
- **Task 3:** (io8developer) Implement the application backend and frontend, adhering to the defined architecture.
- **Task 4:** (io8devops) Test and deploy the application to a staging/production environment.
**Risk Mitigation:**
- Regular communication and coordination among agents.
- Frequent code reviews to ensure quality and adherence to coding standards.
- Version control using Git to manage code changes and facilitate collaboration.
**Contingency Plan:**
- If any unexpected issues arise during development or testing, adjust the timeline and re-evaluate the task assignments.
- Regular check-ins to prevent scope creep.
**Communication:**
- Utilize shared documents to track progress and share updates.
- Daily stand-up meetings to address any roadblocks and keep everyone synchronized.
---
## CODER PLAN UPDATE - 2025-09-25 05:46:04
## Phase 5: Documentation (io8codermaster)
- **Task 5:** (io8codermaster) Create and update all necessary documentation including user guides, API specifications, and architecture diagrams, adhering to the existing projects documentation standards.
- Document all updates and modifications made to the original plan during project execution.
**Timeline (Updated):**
- **Day 11-12:** Documentation and Final Review (io8codermaster)
**Resources (Updated):**
- Existing base project documentation templates.
- io8codermaster agent to manage documentation process.
**Risk Mitigation (Updated):**
- Regular check-ins and reviews to ensure completeness and quality of documentation.
**Contingency Plan (Updated):**
- If inconsistencies arise in documentation, allocate additional time for review and updates.
**Communication (Updated):**
- Utilize shared documents for feedback and review during the documentation process.

View File

@ -60,4 +60,73 @@ The boilerplate will provide the following functional capabilities out-of-the-bo
- Singleton services (e.g., logging, authentication) must be provided in the `CoreModule`.
- Reusable components, pipes, and directives that do not have a dependency on services must be declared and exported in the `SharedModule`.
- All major application features should be encapsulated within their own lazy-loaded modules.
- Environment-specific variables (e.g., API endpoints) must be managed in the `environments` folder.
- Environment-specific variables (e.g., API endpoints) must be managed in the `environments` folder.
---
## BUSINESS ANALYSIS UPDATE - 2025-09-25 05:46:26
## Analysis Document Update - 2025-09-25 05:46:30
### Project Overview (To-Do App)
The project aims to develop a simple yet functional to-do application. Based on the user prompt, this application will allow users to create, manage, and track tasks. The application should be user-friendly and intuitive, allowing for efficient task management.
### User Requirements
- Add new tasks with descriptions and due dates.
- Mark tasks as complete.
- Edit or delete existing tasks.
- View a list of tasks, potentially filtered by status (e.g., completed, incomplete).
- Possibly include features like task prioritization and reminders (MVP scope to be determined in subsequent phases).
### Functional Requirements
- FR-001: Task Creation: The system shall allow users to add new tasks with a description and optional due date.
- FR-002: Task Completion: The system shall allow users to mark tasks as complete.
- FR-003: Task Editing: The system shall allow users to edit existing tasks (description, due date).
- FR-004: Task Deletion: The system shall allow users to delete tasks.
- FR-005: Task Listing: The system shall display a list of tasks, optionally filtered by completion status.
### Non-Functional Requirements
- NFR-001: Usability: The application should be easy to use and intuitive.
- NFR-002: Performance: The application should respond quickly to user actions.
- NFR-003: Reliability: The application should be reliable and stable.
### User Stories
- As a user, I want to add new tasks to my to-do list so that I can track my work.
- As a user, I want to mark tasks as complete so that I can track my progress.
- As a user, I want to edit existing tasks so that I can correct mistakes or update information.
- As a user, I want to delete tasks from my list so that I can remove completed or irrelevant items.
- As a user, I want to view a list of my tasks so that I can easily see what I need to do.
### Business Rules
- Tasks cannot have empty descriptions.
- Due dates must be valid dates.
---
## BUSINESS ANALYSIS UPDATE - 2025-09-25 05:46:34
## Analysis Document Update - 2025-09-25 05:55:00
### Project Overview (To-Do App) - Detailed
The project aims to build a simple to-do application based solely on the user prompt. This application will provide basic task management functionalities such as adding, editing, deleting, and marking tasks as complete. The focus is on a minimal viable product (MVP) with potential for future expansion.
### User Needs Analysis
Users need a straightforward way to manage their tasks, including creating, updating, and tracking their completion status. The application should be intuitive and easy to use, minimizing the learning curve for users.
### Functional Requirements Breakdown - Detailed
The functional requirements detailed in the previous section adequately cover the scope of the MVP. Further analysis might be needed in subsequent iterations to determine the need for advanced features like prioritization or reminders.
### Non-Functional Requirements - Prioritization
Usability, performance, and reliability are crucial non-functional requirements for this application. Usability is prioritized to ensure a seamless user experience. Performance is important for responsiveness, and reliability ensures data integrity.
### User Stories - Elaborated
The user stories previously identified represent the core user needs for this MVP. More detailed acceptance criteria are defined in the requirements document.
### Business Rules - Clarification
The stated business rules about non-empty descriptions and valid due dates are essential for data integrity. Additional business rules may be identified during the detailed design phase.
### Technology Stack Considerations (Based on Base Project Context)
While the base project utilizes Angular and Clarity, this to-do app could be built using a more lightweight framework for simplicity and faster development, considering the limited scope of the MVP. A decision on the technology stack will be made in the architecture phase.

View File

@ -135,4 +135,69 @@ Lazy Loading: The architecture strongly encourages the use of lazy-loaded featur
Modular Design: The strict separation of concerns into Core, Shared, and Feature modules makes the codebase easier to manage, test, and scale as the application grows in complexity.
State Management: For applications with complex state, a state management library like NgRx or Akita can be easily integrated into this architecture without requiring significant refactoring.
State Management: For applications with complex state, a state management library like NgRx or Akita can be easily integrated into this architecture without requiring significant refactoring.
---
## ARCHITECTURE UPDATE - 2025-09-25 05:46:48
## Architecture Document Update - 2025-09-25 05:55:00
### System Overview Update
This section describes the architecture for a simple to-do application. The application will follow a straightforward three-tier architecture: Presentation (UI), Application (Business Logic), and Data (Persistence). Given the MVP scope, we will prioritize simplicity and ease of development. Future iterations may consider a more complex microservices architecture if needed.
### Architecture Pattern Update
The chosen architectural pattern for this MVP is a simple Model-View-Controller (MVC) architecture. This is suitable for the relatively straightforward functionality of the to-do app. The separation of concerns between the model (data), view (UI), and controller (business logic) will be clearly defined.
### Component Design Update
- **Task Component:** Responsible for displaying individual tasks. This will include functionalities for marking tasks as complete, editing, and deleting tasks.
- **TaskList Component:** Responsible for displaying the list of tasks. This will include any filtering or sorting logic.
- **TaskCreation Component:** A form to create new tasks, including description and optional due date validation.
- **AppComponent:** The main application component, responsible for routing and potentially housing shared components.
### Data Architecture Update
For the MVP, a simple in-memory data store (e.g., using a JavaScript array or object) or local storage will be sufficient. This approach avoids the complexity of setting up a database for the initial version. The chosen persistence layer will be revisited in future iterations if the application grows beyond this initial scope.
### API Design Update
The API design is not applicable for this MVP as no backend is required. Data interaction will be limited to client-side operations.
### Security Architecture Update
Security measures are minimal for this MVP. Client-side validation is sufficient to ensure data integrity; however, data is stored client-side, making the application vulnerable to loss of data when clearing browser data. This will be re-evaluated in future phases.
### Scalability Considerations Update
For this MVP, scalability concerns are minimal. The chosen technologies and architecture are sufficient for a small-scale, single-user application. Future scalability considerations will be addressed when needed.
---
## ARCHITECTURE UPDATE - 2025-09-25 05:46:55
## Architecture Document Update - 2025-09-25 06:00:00
### System Overview Update
The system will consist of a single-page application (SPA) with client-side data management. No server-side components are needed for the MVP. The architecture follows a simple MVC pattern with data stored locally in the browser using local storage.
### Architecture Pattern Update
The MVC pattern is appropriate given the limited scope. The model represents the task data, the view displays the tasks and user interface, and the controller handles user interactions and updates the model.
### Component Design Update - Detailed
- **Task Component:** Displays individual tasks with buttons for completion, editing, and deletion. It receives the task data as props from the TaskList Component.
- **TaskList Component:** Displays a list of tasks. It manages the data and updates state using local storage. Implements filtering/sorting as needed. Provides editing and deletion functionality.
- **TaskCreation Component:** A form for creating new tasks. Data validation (non-empty description, valid date) occurs here before updating the task list.
- **AppComponent:** A container component. Handles routing (although there's no need for multi-page routing in this MVP), manages application state, and may handle persistence of tasks in local storage.
### Data Architecture Update - Detailed
Tasks will be stored as JSON objects in browser local storage. The structure of each task object will be: `{id: number, description: string, dueDate: string, isComplete: boolean}`. `id` will be a unique number auto-generated on each task creation. This approach avoids the complexity of a database for the MVP.
### API Design Update
Not applicable for the MVP. Data interaction is solely client-side.
### Security Architecture Update
For the MVP, security concerns are limited to the persistence of data in the local storage. As previously stated, browser data clearing poses a data loss risk. Future versions should explore more robust security measures.
### Scalability Considerations Update
Scalability is not a major concern for this MVP, focusing on a single user. For future scalability, client-side storage might be replaced with a server-side database and a backend API.

View File

@ -59,4 +59,162 @@ The following features and functionalities are explicitly out of scope for the b
- **Authentication/Authorization Logic:** While the architecture supports the implementation of security features, no pre-built authentication or authorization logic is included.
- **State Management:** The boilerplate does not include a state management library (e.g., NgRx, Akita) by default, allowing developers to choose the best solution for their needs.
- **Business Logic:** No specific business logic or application features are included beyond the basic structural components.
- **CI/CD Pipelines:** While the project is ready for CI/CD, no pre-configured pipelines are included.
- **CI/CD Pipelines:** While the project is ready for CI/CD, no pre-configured pipelines are included.
---
## PRD UPDATE - 2025-09-25 05:47:24
## 1. Executive Summary
[2025-09-25T12:07:00] This document outlines the product requirements for a simple to-do application. The application will allow users to create, manage, and track tasks, focusing on a minimal viable product (MVP) with potential for future expansion.
## 2. Product Vision & Strategy
[2025-09-25T12:07:00] The vision is to provide a user-friendly and efficient to-do application for managing daily tasks. The strategy is to focus on an MVP with core functionalities, ensuring a smooth user experience and laying the groundwork for future feature additions.
## 3. Target Users & Personas
[2025-09-25T12:07:00] The target user is an individual seeking a simple and intuitive to-do application to manage personal or work tasks. Personas will be developed in a future iteration.
## 4. Problem Statement
[2025-09-25T12:07:00] Users lack a simple and effective tool for managing their tasks, leading to disorganization and decreased productivity. This application addresses this problem by providing a user-friendly interface for creating, tracking, and managing tasks.
## 5. Solution Overview
[2025-09-25T12:07:00] A web-based to-do application that allows users to add, edit, delete, and mark tasks as complete. The MVP will include basic task management features, with potential for future extensions such as task prioritization and reminders.
## 6. Functional Requirements
[2025-09-25T12:07:00]
- **FR-001: Task Creation:** The system shall allow users to create new tasks with a description and an optional due date. The description field is mandatory. Due dates must be valid dates.
- **FR-002: Task Completion:** The system shall allow users to mark tasks as complete.
- **FR-003: Task Editing:** The system shall allow users to edit existing tasks (description and due date).
- **FR-004: Task Deletion:** The system shall allow users to delete tasks.
- **FR-005: Task Listing:** The system shall display a list of tasks. The list should allow for filtering by completion status (complete/incomplete).
## 7. Non-Functional Requirements
[2025-09-25T12:07:00]
- **NFR-001: Usability:** The application should be intuitive and easy to use.
- **NFR-002: Performance:** The application should be responsive to user actions.
- **NFR-003: Reliability:** The application should be stable and data should be persistently stored.
- **NFR-004: Security:** Data should be protected using appropriate client-side security measures. (Further enhancements in future iterations)
## 8. Epic Stories
[2025-09-25T12:07:00]
### Epic 1: Core Task Management
**Epic Description:** Implement the core functionalities for creating, managing, and tracking tasks.
**Business Value:** Provides the fundamental value proposition of the application task management.
**Acceptance Criteria:** All functional requirements (FR-001 through FR-005) are met.
**User Stories:**
- **US-001:** Add a New Task
- **As a** user
- **I want to** add a new task with a description and optional due date
- **So that** I can track my tasks.
- **Acceptance Criteria:**
- [ ] A new task is added to the list with a description and optionally a due date.
- [ ] The description field is validated to prevent empty entries.
- [ ] Due date validation ensures it's a valid date format.
- **Story Points:** 5
- **Priority:** High
- **US-002:** Mark Task as Complete
- **As a** user
- **I want to** mark a task as complete
- **So that** I can track my progress.
- **Acceptance Criteria:**
- [ ] A task's completion status is updated.
- [ ] The UI reflects the change in status.
- **Story Points:** 3
- **Priority:** High
- **US-003:** Edit Existing Task
- **As a** user
- **I want to** edit an existing task's description and due date
- **So that** I can correct mistakes or update information.
- **Acceptance Criteria:**
- [ ] Existing task information is updated.
- [ ] Description and due date fields are validated.
- [ ] The UI reflects the changes.
- **Story Points:** 5
- **Priority:** High
- **US-004:** Delete Task
- **As a** user
- **I want to** delete a task
- **So that** I can remove completed or irrelevant items.
- **Acceptance Criteria:**
- [ ] The selected task is removed from the list.
- [ ] The UI reflects the removal.
- **Story Points:** 3
- **Priority:** High
- **US-005:** View Task List
- **As a** user
- **I want to** view a list of all tasks, filtered by completion status
- **So that** I can easily see what I need to do.
- **Acceptance Criteria:**
- [ ] A list of all tasks is displayed.
- [ ] Tasks can be filtered to show only complete or incomplete tasks.
- **Story Points:** 5
- **Priority:** High
## 9. User Interface Requirements
[2025-09-25T12:07:00] A clean, intuitive interface is required. Wireframes and mockups will be created in the design phase. The UI should be responsive across different screen sizes.
## 10. Technical Requirements
[2025-09-25T12:07:00] React.js with local storage for data persistence. Detailed technical specifications are in the architecture and technology stack documents. The application should be easily testable.
## 11. Success Metrics & KPIs
[2025-09-25T12:07:00] Key metrics include user engagement (number of tasks created, edited, completed), user satisfaction, and the number of active users.
## 12. Risk Assessment
[2025-09-25T12:07:00] Potential risks include data loss due to local storage reliance and scalability limitations. Mitigation strategies will be defined in the project plan.
## 13. Timeline & Milestones
[2025-09-25T12:07:00] A detailed timeline will be defined in the project plan.
## 14. Dependencies & Assumptions
[2025-09-25T12:07:00] The primary assumption is that basic React development skills are available. The project is not dependent on any external services for this MVP.
---
## PRD UPDATE - 2025-09-25 05:47:35
# Product Requirements Document (PRD) - Update: 2025-09-25 14:00:00
## 8. Epic Stories - Update: 2025-09-25 14:00:00
### Epic 1: Core Task Management - Update: 2025-09-25 14:00:00
**User Stories - Additions:**
- **US-006:** Filter Tasks by Completion Status
- **As a** user
- **I want to** filter the task list to show only complete or incomplete tasks
- **So that** I can easily focus on tasks that still need attention.
- **Acceptance Criteria:**
- [ ] A filter control (e.g., dropdown, buttons) is available to select the filter criteria (complete/incomplete).
- [ ] The task list updates correctly when the filter is applied.
- **Story Points:** 3
- **Priority:** Medium
- **US-007:** Sort Tasks by Due Date
- **As a** user
- **I want to** sort the tasks by due date (ascending/descending)
- **So that** I can prioritize tasks based on their deadlines.
- **Acceptance Criteria:**
- [ ] A sort control (e.g., dropdown, buttons) is available for sorting by due date in ascending or descending order.
- [ ] The task list updates correctly when the sort order is changed.
- **Story Points:** 5
- **Priority:** Medium
## 9. User Interface Requirements - Update: 2025-09-25 14:00:00
[2025-09-25T14:00:00] The UI should be clean and simple, following a minimalistic design. A clear visual distinction between completed and incomplete tasks is required. The filter and sort controls (from US-006 and US-007) should be easy to find and use. Accessibility guidelines must be followed.
## 10. Technical Requirements - Update: 2025-09-25 14:00:00
[2025-09-25T14:00:00] The application will utilize React.js with local storage for data persistence. Data validation on the client-side is crucial. Unit tests are required for all components. The application must be compatible with modern browsers.
## 12. Risk Assessment - Update: 2025-09-25 14:00:00
[2025-09-25T14:00:00] The primary risk is data loss due to reliance on local storage. Mitigation: Clear instructions for users on how to back up their data or use a browser extension for synchronisation with cloud storage. A warning will be displayed when local storage is cleared.

View File

@ -70,4 +70,80 @@ Prioritization will focus on establishing a stable and usable foundation. **Must
- Integrating a state management library (e.g., NgRx, Akita) with an example implementation.
- Adding more complex example pages (e.g., a settings page, a user profile).
- Creating custom Angular Schematics to automate the creation of new feature modules that follow the boilerplate's conventions.
- Including pre-configured templates for CI/CD pipelines (e.g., GitHub Actions).
- Including pre-configured templates for CI/CD pipelines (e.g., GitHub Actions).
---
## PROJECT PLAN UPDATE - 2025-09-25 05:47:24
## Project Plan: To-Do App
[2025-09-25T12:08:00] This plan outlines the development process for the To-Do App MVP.
### Project Methodology:
[2025-09-25T12:08:00] Agile (Scrum) methodology will be used, emphasizing iterative development and frequent feedback.
### Project Phases:
[2025-09-25T12:08:00]
1. **Inception (1 day):** Finalize requirements, confirm technology stack, set up project environment.
2. **Design (2 days):** Create wireframes, UI mockups, and database schema (if applicable for future iterations).
3. **Development (5 days):** Develop the core features (task creation, completion, editing, deletion, display). Focus on unit and functional testing.
4. **Testing & QA (2 days):** Thoroughly test the application for functionality, usability, and performance. Address bugs and refine the application based on testing results.
5. **Deployment (1 day):** Deploy the application to a suitable platform (e.g., GitHub Pages, Netlify).
### Timeline & Milestones:
[2025-09-25T12:08:00]
- **Milestone 1 (Day 1):** Project setup and requirements finalized.
- **Milestone 2 (Day 3):** Design complete (wireframes, mockups).
- **Milestone 3 (Day 8):** Core functionality development complete.
- **Milestone 4 (Day 10):** Testing and QA complete.
- **Milestone 5 (Day 11):** Application deployed.
### Resource Allocation:
[2025-09-25T12:08:00] One developer will handle the entire development process for this MVP.
### Risk Mitigation Strategies:
[2025-09-25T12:08:00]
- **Data Loss:** Implement proper error handling and backup mechanisms for local storage. Instruct users on the importance of not clearing browser cache/storage.
- **Scalability:** While scalability isn't a major concern for the MVP, design decisions will be made to facilitate future scalability.
- **Testing:** Thorough unit and integration tests will help prevent issues and improve application reliability.
### Communication Plan:
[2025-09-25T12:08:00] Regular updates and progress reports will be provided. Issues will be tracked and addressed using a suitable issue tracker (e.g., GitHub Issues).
### Success Metrics:
[2025-09-25T12:08:00] Successful completion of all milestones, user satisfaction (measured through feedback or surveys in future iterations), and a stable and functional MVP.
---
## PROJECT PLAN UPDATE - 2025-09-25 05:47:35
# Project Plan: To-Do App - Update: 2025-09-25 14:00:00
### Project Phases - Update: 2025-09-25 14:00:00
1. **Inception (1 day):** Finalize requirements, select technology stack (React, CSS Modules, Context API), set up project environment.
2. **Design (2 days):** Create wireframes, UI mockups for Task Component, TaskList Component, and TaskCreation Component. Define the detailed data structure for tasks.
3. **Development (7 days):** Develop core features (task creation, completion, editing, deletion, display, filtering, sorting). Write unit tests for all components.
4. **Testing & QA (3 days):** Conduct thorough testing for functionality, usability, and performance. Address bugs and refine the application based on feedback.
5. **Deployment (1 day):** Deploy to a suitable platform (e.g., GitHub Pages, Netlify).
### Timeline & Milestones - Update: 2025-09-25 14:00:00
- **Milestone 1 (Day 1):** Project setup and requirements finalized.
- **Milestone 2 (Day 3):** Design complete (wireframes, mockups).
- **Milestone 3 (Day 10):** Core functionality development complete.
- **Milestone 4 (Day 13):** Testing and QA complete.
- **Milestone 5 (Day 14):** Application deployed.
### Resource Allocation - Update: 2025-09-25 14:00:00
One developer will handle the entire development process for this MVP. Increased time allocated for testing to ensure application quality.
### Risk Mitigation Strategies - Update: 2025-09-25 14:00:00
- **Data Loss:** Implement a clear warning message to users before clearing browser data (local storage) and guide users on how to back up their data.
- **Scalability:** While scalability is not a primary concern for this MVP, design decisions will be made with potential future scalability in mind.
- **Testing:** Thorough unit and integration tests will be conducted to ensure the quality and reliability of the application.

View File

@ -92,4 +92,83 @@ Generated: Tuesday, September 16, 2025
- **Communication Protocol:** The boilerplate shall use Angular's `HttpClient` module to communicate with a backend over HTTP/HTTPS.
- **API Endpoint Configuration:** The base URL for the backend API shall be configurable via the `environments` files (e.g., `environment.ts`, `environment.prod.ts`).
- **Data Format:** The boilerplate is designed to work with APIs that transact data in **JSON** format.
- **Error Handling:** The architecture shall support a centralized way to handle API errors, typically through an `HttpInterceptor` provided in the `CoreModule`.
- **Error Handling:** The architecture shall support a centralized way to handle API errors, typically through an `HttpInterceptor` provided in the `CoreModule`.
---
## REQUIREMENTS UPDATE - 2025-09-25 05:46:26
## Requirements Document Update - 2025-09-25 05:46:30
### FR-001: Task Creation
- **Description:** The system shall allow users to create new tasks with a description and an optional due date.
- **Acceptance Criteria:** A new task is successfully added to the task list with a non-empty description. The due date, if provided, is a valid date. The task is correctly persisted (e.g. in local storage or database).
- **Priority:** High
### FR-002: Task Completion
- **Description:** The system shall allow users to mark a task as complete.
- **Acceptance Criteria:** When a user marks a task as complete, its status is updated to reflect this. This change is visually indicated to the user. The change is persisted.
- **Priority:** High
### FR-003: Task Editing
- **Description:** The system shall allow users to edit existing tasks (description and due date).
- **Acceptance Criteria:** Users can modify the description and/or due date of a task. Changes are saved and visually reflected. Invalid due dates are rejected with appropriate feedback to the user.
- **Priority:** Medium
### FR-004: Task Deletion
- **Description:** The system shall allow users to delete tasks.
- **Acceptance Criteria:** A selected task is removed from the task list. The deletion is persisted.
- **Priority:** Medium
### FR-005: Task Listing
- **Description:** The system shall display a list of tasks.
- **Acceptance Criteria:** All tasks are displayed in a clear and organized manner. Completed and incomplete tasks are clearly distinguishable. The list is updatable in real-time.
- **Priority:** High
### NFR-001: Usability
- **Description:** The application should be intuitive and easy to navigate.
- **Acceptance Criteria:** User testing confirms that the application is easy to learn and use. Users complete key tasks quickly and without difficulty.
### NFR-002: Performance
- **Description:** The application should respond quickly to user interactions.
- **Acceptance Criteria:** Page load times are within acceptable limits (<2 seconds). User actions (adding, deleting, completing tasks) are processed quickly and efficiently.
### NFR-003: Reliability
- **Description:** The application should be stable and reliable.
- **Acceptance Criteria:** The application should not crash or experience unexpected errors during normal use. Data persistence is reliable; data is not lost after page refreshes or application restarts.
---
## REQUIREMENTS UPDATE - 2025-09-25 05:46:34
## Requirements Document Update - 2025-09-25 05:55:00
### FR-006: Task Prioritization (Future Consideration)
- **Description:** The system *may* allow users to prioritize tasks (e.g., high, medium, low). This is a potential feature for future development, not included in MVP.
- **Acceptance Criteria:** Tasks can be assigned priority levels, and these priorities are displayed to the user. Sorting and filtering by priority should be implemented.
- **Priority:** Low
### FR-007: Task Reminders (Future Consideration)
- **Description:** The system *may* allow users to set reminders for tasks. This is a potential feature for future development, not included in MVP.
- **Acceptance Criteria:** Users can set reminders for tasks; these reminders are triggered at the specified time and delivered via suitable means (e.g., browser notifications).
- **Priority:** Low
### NFR-004: Scalability
- **Description:** The application should be scalable to accommodate a growing number of users and tasks.
- **Acceptance Criteria:** The application should perform efficiently even with a large number of users and tasks. Database design and server architecture should account for scalability.
- **Priority:** Medium
### NFR-005: Maintainability
- **Description:** The application should be easy to maintain and update.
- **Acceptance Criteria:** The codebase should be well-structured, documented, and easy to understand. Testing should be comprehensive to facilitate future updates.
- **Priority:** High
### Data Requirements
- A database (or suitable persistent storage) is needed to store tasks. This database should store at least the task description, due date (optional), and completion status.
### Interface Requirements
- The UI should be simple and intuitive, enabling users to easily interact with the application's core functionalities.
- The design should be responsive and adaptable to different screen sizes.

View File

@ -36,4 +36,57 @@ Generated: Tuesday, September 16, 2025
* **Code Formatting/Linting:**
* **ESLint:** Used for identifying and reporting on patterns in ECMAScript/JavaScript code.
* **Prettier:** An opinionated code formatter that enforces a consistent style.
* **EditorConfig:** Helps maintain consistent coding styles for multiple developers working on the same project across various editors and IDEs.
* **EditorConfig:** Helps maintain consistent coding styles for multiple developers working on the same project across various editors and IDEs.
---
## TECH STACK UPDATE - 2025-09-25 05:46:48
## Technology Stack Document Update - 2025-09-25 05:55:00
Given the scope of the MVP for the to-do app, a simpler technology stack is chosen to minimize complexity and development time. A more robust stack could be employed in future iterations.
### Frontend Technologies Update
- **Framework:** React (for its simplicity and component-based approach)
- **Styling:** CSS Modules (for modularity and maintainability)
- **State Management:** Context API (for efficient state management in React)
### Backend Technologies Update
- N/A (No backend required for MVP)
### Database Technologies Update
- N/A (In-memory data or local storage for MVP. A database might be considered for future iterations)
### Infrastructure Update
- N/A (No server-side infrastructure needed for MVP)
### Development Tools Update
- **Version Control:** Git
- **Testing:** Jest and React Testing Library
- **CI/CD:** GitHub Actions (optional, for future iterations)
---
## TECH STACK UPDATE - 2025-09-25 05:46:55
## Technology Stack Document Update - 2025-09-25 06:00:00
### Frontend Technologies Update
- **Framework:** React (Simplicity, component-based architecture, large community support)
- **Styling:** CSS Modules (maintainability, avoids global stylesheet conflicts)
- **State Management:** React's Context API and useState/useReducer hooks for managing the application's task state. Local storage will be used for persistence.
### Backend Technologies Update
Not applicable for this MVP. Future iterations might consider Node.js and Express for a backend, with a database for data persistence.
### Database Technologies Update
Not applicable for the MVP. Local storage will be sufficient. Future versions could utilize a more robust solution like SQLite or a cloud-based database (e.g., PostgreSQL on AWS RDS).
### Infrastructure Update
Not applicable for the MVP. The app will run directly in the user's browser.
### Development Tools Update
- **Version Control:** Git
- **Testing:** Jest and React Testing Library. Unit testing of components and functional testing of user interactions are essential.
- **CI/CD:** GitHub Actions (can be implemented for future versions to automate builds and deployments)